Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00635
StatusFinaled
Name TREASURED HOMES
Site Address 1612 N 11TH ST
Project NameKay Vetsch Residence
Customer Number 
ePlanReviewYes
Description
DRH12-00079; (See BLD12-01943 for demolition of single family dwelling.) Permit for the construction of a new 3725 sq. ft., two story (first story 1278 sq. ft., second story 1351 sq. ft., 796 sq. ft. unfinished basement) single family dwelling with 4 bedrooms, 2.5 bathrooms, and approximately 578 sq. ft. of covered patio/porch. There is an existing 480 sq. ft. detached garage on the lot that was built under Bld1056276. All work is to be done per the approved plans, engineering, ResCheck, ACCA report, as approved under Certificate of Appropriateness DRH12-00079, and any notations. R-1C zoning and setbacks per planning.//leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/21/201612/22/201612/22/2016APASS
DetailsTony Young
Marty
DOC - Permit Finaled12/22/201612/22/201612/22/2016PPASS
DetailsTony Young
c of o sent via e-mail to Marty
BLD-Final12/15/201612/16/201612/16/2016APART
DetailsTony Young
If needed my number is ###-#### Marty Phone #: ###-#### Inspection requested via web by Marty Pieroni///, needs fireplace final,, historical 1st,, walk through only
Zoning Approval12/16/201612/16/201612/16/2016 PASS
DetailsTed Vanegas
BLD-Energy code compliance8/26/20168/29/20168/29/2016PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Marty Pieroni
BLD-Framing/Rough-in8/24/20168/25/20168/24/2016ACANC
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Marty Pieroni
BLD-Framing/Rough-in8/24/20168/24/20168/24/2016APART
DetailsPhil Shearer
Tony Ben said he would be finished no later then 11 wondering if you could swing by close to that time to look over, Ben''s number is ###-#### Phone #: ###-#### Inspection requested via web by Marty Pieroni. Provide engineered fix on floor joist.
BLD-Framing/Rough-in8/19/20168/22/20168/22/2016APART
DetailsTony Young
Please call me with a time you can be there. I have engineering changes I need to bring to you for the final framing inspection thanks Phone #: ###-#### Inspection requested via web by Marty Pieroni,,, c/n.. ok to insulate
BLD-Framing/Rough-in8/19/20168/19/20168/19/2016PDEFR
DetailsJim Storey
Please call me with a time you can be there. I have engineering changes I need to bring to you for the final framing inspection thanks Phone #: ###-#### Inspection requested via web by Marty Pieroni mech failled/ defred to monday
BLD-Conference7/15/20167/15/20167/15/2016PDONE
DetailsJim Sly
Framer has questions on bracing can we have an inspector swing by to confirm a few issues please. Call myself or Ben Cicak framer at ###-####085 thanks Phone #: ###-#### Inspection requested via web by Marty Pieroni
BLD-Foundation6/9/20166/10/20166/10/2016APASS
DetailsDave Hannah
Matt Phone #: ###-####
BLD-Footing6/8/20166/9/20166/9/2016APASS
DetailsMike Jordan
Matt Phone #: ###-####
BLD-Footing6/8/20166/8/20166/8/2016PNR
DetailsTony Young
Matt Phone #: ###-####
BLD-Foundation5/24/20165/25/20165/26/2016APART
DetailsDave Hannah
Matt Phone #: ###-#### basement walls ok
BLD-Footing5/16/20165/17/20165/17/2016APART
DetailsTony Young
Matt Phone #: ###-####,, basement footings ok
BLD-Footing5/16/20165/16/20165/16/2016PCANC
DetailsTony Young
Matt Phone #: ###-####,, canc per Matt
Issue PAID IN FULL permit  5/4/2016 DONE
Inspection Record Card- Bld  5/4/2016 DONE
OVERRIDE  5/3/2016  
Routing - Design Review5/3/2016 5/3/2016 PASS
DetailsMatthew A Halitsky
per ePlan
Routing - PLAN CHECK5/3/2016 5/3/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  5/3/2016 DONE
Permit Ready to Issue  5/3/2016 DONE
NEED RP
Plan assigned to (LEG) Tisha3/15/2016 5/3/2016 DONE
DetailsTisha Gallop
3rd review 4/27; 2nd review 4/7; 1st review 3/25; plan check,
Plan resubmittals received  4/29/2016 DONE
DetailsTisha Gallop
Routing - PLAN CHECK4/27/2016 4/27/2016 FAIL
DetailsTisha Gallop
building review items not addressed
Routing - MECHANICAL4/20/2016 4/22/2016 PASS
DetailsTroy James
added basement
Routing - Design Review4/20/2016 4/22/2016 PASS
DetailsMatthew A Halitsky
Plan resubmittals received  4/22/2016 DONE
DetailsTisha Gallop
Routing - PLAN CHECK4/20/2016 4/21/2016 FAIL
DetailsTisha Gallop
Plan resubmittals received  4/7/2016 DONE
spoke to Marty. Needs updated wall bracing plan uploaded. He also said customer now wants to add basement to plans so sent resubmittal task back over to customer to re-upload all plans affected by changes. Transfered him to Matt to discuss DR conditins
Routing - Design Review3/30/2016 4/4/2016 FAIL
DetailsMatthew A Halitsky
per ePlan
Routing - PLAN CHECK3/30/2016 3/31/2016 FAIL
DetailsTisha Gallop
did not address previous comments
Plan resubmittals received  3/26/2016 DONE
1st review completed  3/25/2016 FAIL
pending approval by plan check and design review
Routing - PLAN CHECK3/15/2016 3/25/2016 FAIL
DetailsTisha Gallop
see changemarks
Routing - Design Review3/15/2016 3/22/2016 FAIL
DetailsMatthew A Halitsky
per ePlan
Route to Impact Fee Review3/15/20163/18/20163/16/2016 PASS
DetailsStephanie Jensen
Routing - MECHANICAL3/15/2016 3/16/2016 PASS
DetailsTroy James
Routing - Addressing3/15/2016 3/15/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/15/2016 3/15/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  3/15/2016 DONE
DetailsChristina Prado
Intake Approval  3/15/2016 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  3/15/2016 DONE
DetailsChristina Prado
Intake Approval  3/2/2016 FAIL
DetailsChristina Prado
Need Stair section, building cross section & basement floor plan
Application received  3/1/2016 DONE
Application submitted via PDS Online on Mar 1 2016 11:25AM