Print Statement | | | 12/5/2016 | | DONE |
|
|
|
|
First Notice | 10/12/2016 | 10/12/2016 | 11/15/2016 | | DONE |
Mike Jordan
|
|
|
Mailed 11-16-16
|
BLD-Final | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Mike Jordan
|
|
|
Rilley Phone #: ###-####
|
DOC - Permit Finaled | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Mike Jordan
|
|
|
Door hardware issue resolved.
|
BLD-Final | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | FAIL |
Mike Jordan
|
|
|
Provide passage hardware from new exit.
|
BLD-Final | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | NR |
Mike Jordan
|
|
|
Contractor still has not verified passage hardware on exit door. A reinspection has been scheduled for the am to either verify passage hardware or issue a correction notice.
|
BLD-Final | 10/7/2016 | 10/10/2016 | 10/10/2016 | A | CANC |
Mike Jordan
|
|
|
moved to pm.
|
BLD-Final | 10/7/2016 | 10/10/2016 | 10/10/2016 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | NR |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Contractor has not verified removal of dead bolt. Rescheduled for monday 10-10.
|
FIRE-Final Inspection | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | NR |
Mike Jordan
|
|
|
would like call ahead; Scott Phone #: ###-####. Needs fire/life/safety and sprinkler finals.
|
FIRE-Final Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide inspection for the fire sprinkler permit, repair existing exit sign over the main exit, provide fire extinguisher on the new mezzanine, remove the deadbolt lock on the door between the new area and the existing area.
|
BLD-Ceiling Grid Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PART |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Ceiling grid ok. Pending other trades prior to cover.
|
BLD-Wall cover | 7/11/2016 | 7/12/2016 | 7/12/2016 | P | PASS |
Phil Shearer
|
|
|
As early as possible Phone #: 2084098651 >> Inspection requested via mobile web by Scott Simons
|
BLD-Energy code compliance | 7/8/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
Phil Shearer
|
|
|
Call prior to going Phone #: 2084098651 >> Inspection requested via mobile web by Scott Simons
|
BLD-Framing/Rough-in | 7/8/2016 | 7/8/2016 | 7/8/2016 | P | PASS |
Mike Jordan
|
|
|
As early as possible Phone #: 2084098651 >> Inspection requested via mobile web by Scott Simons
|
BLD-Framing/Rough-in | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Mike Jordan
|
|
|
As early as possible Phone #: 2084098651 >> Inspection requested via mobile web by Scott Simons. Mezzanine floor framing only. ok to insulate.
|
BLD-Conference | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | DONE |
Mike Jordan
|
|
|
Reilly Phone #: ###-####
|
BLD-Footing | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | DEFR |
Mike Jordan
|
|
|
Kirk Phone #: ###-####. Secial insp.
|
Issue PAID IN FULL permit | | | 5/4/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 4/29/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 3/24/2016 | 3/24/2016 | 4/29/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Print Occupancy Form | | | 4/29/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/29/2016 | | DONE |
|
|
|
Spoke with Kirk informing him that this permit is ready to be picked up, the fee amount that is due and that we just need him to fill out a 302 and know who the RP is going to be
|
Routing - PLAN CHECK | 4/25/2016 | | 4/29/2016 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 4/29/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2016 | | DONE |
|
|
|
|
Routing - Design Review | 4/29/2016 | | 4/29/2016 | | PASS |
Josh Wilson
|
|
|
|
Permit Ready to Issue | | | 4/29/2016 | | DONE |
|
|
|
need GC form ***MET*** RP-no achd see attached-no rev cert of val since the GC turned in app
|
Routing - Erosion and Sediment | 4/28/2016 | | 4/28/2016 | | PASS |
Evan Jenkins
|
|
|
(KELLER SUPPLY - Kohler Showroom) Permit for interior tenant improvements to an existing 45,000 sq. ft, building to create an 704 sq. ft. of showroom and an additinal 704 sq. ft. of mezzanine space with work to include the construction of new interior bearing walls, infill of one exterior man door, cutting a new opening for a new exterior man door and installation of related interior finishes and displays per the approved plans and the attached engineering.
|
Routing - FIRE | 4/23/2016 | 4/23/2016 | 4/25/2016 | | PASS |
Katie Marron
|
|
|
Revised comments attached to plans.
|
Routing - PLAN CHECK | 4/13/2016 | | 4/23/2016 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 4/22/2016 | | DONE |
|
|
|
received 2 copies of sheets 1A, 2, 6, and 9- gave to Carl Madsen
|
Plan resubmittals received | | | 4/18/2016 | | DONE |
|
|
|
resubmittals received 2 sets of sheets 1, 1A, 2, 3, 4, 5, 6, 7, 8, 9, PD1, P2, MO, M1, M2, M3, E2, E1, E2 and tood to Carl M
|
Routing - FIRE | 4/12/2016 | | 4/13/2016 | | FAIL |
Katie Marron
|
|
|
Comments attached to plans and emailed to architect.
|
1st review completed | | | 4/13/2016 | | FAIL |
|
|
|
Failed Plan Check, Design Review, Erosion Control and Fire.
|
Routing - PLAN CHECK | 3/28/2016 | | 4/12/2016 | | FAIL |
Carl D Madsen
|
|
|
Sent plan review report to applicant/engineer
|
Routing - Erosion and Sediment | 3/28/2016 | | 3/28/2016 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver letter Request required for approval.
Evan Jenkins 794.3958
|
Routing - PUBLIC WORKS | 3/25/2016 | | 3/25/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 3/24/2016 | | 3/24/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 3/24/2016 | | 3/24/2016 | | FAIL |
Tim L. Woodard
|
|
|
Pending approval of CZC16-00074. TLW
|
Pending Assignment by TLW | 3/24/2016 | | 3/24/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/22/2016 | | DONE |
|
|
|
|
Intake Approval | | | 3/22/2016 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/22/2016 | | DONE |
|
|
|
|
Application received | | 3/1/2016 | | | |
|
|
|
|