Fees Due Hold | 8/24/2016 | | 9/13/2016 | | DONE |
Kristal Soland
|
|
|
|
BLD-Conference | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Jim Storey
|
|
|
Permit is going to expire 8/29. Just need to make sure no work was done (C of O) no work
|
DOC - Permit Expired | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Jim Storey
|
|
|
Permit is going to expire 8/29. Just need to make sure no work was done (C of O) no work
|
Telephone call | | | 8/19/2016 | | DONE |
|
|
|
Spoke with Mike. He informed me that the customers stated to him they weren't going to have the garage built. Permit will expire 8-29
|
Expiration Notice | 8/4/2016 | 8/25/2016 | 8/4/2016 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 4/21/2016 | | |
|
|
|
|
Route to Impact Fee Review | 4/18/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (CDM) | 4/12/2016 | 4/12/2016 | 4/21/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PLANNING Land Div | 4/12/2016 | | 4/21/2016 | | PASS |
Todd Tucker
|
|
|
Signed off per E-plan
|
Routing - PLAN CHECK | 4/21/2016 | | 4/21/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2016 | | DONE |
|
|
|
NEED RP, GC & Rev cert of Val/// GC and cert of value met 4-28-16- STILL NEED RP
|
Routing - PLAN CHECK | 4/12/2016 | | 4/18/2016 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/18/2016 | | FAIL |
|
|
|
|
Routing - FIRE | 4/12/2016 | 4/12/2016 | 4/13/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Design Review | 4/12/2016 | | 4/13/2016 | | PASS |
Josh Wilson
|
|
|
|
Pending Assignment by TLW | 4/12/2016 | | 4/12/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 4/12/2016 | | 4/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/12/2016 | | 4/12/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/12/2016 | | 4/12/2016 | | PASS |
Evan Jenkins
|
|
|
(CAPITOL CITY AUTO - Detached Garage) Add 450 square foot garage building with an overhead door
|
Routing PW Drainage | 4/12/2016 | | 4/12/2016 | | PASS |
Brian Murphy
|
|
|
less than 10000 ft
|
Intake Approval | | | 4/7/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 3/31/2016 | | FAIL |
|
|
|
3-31-16 Please provide the following items
The structural plans are required to be stamped by the structural engineer.
Provide the foundation engineering.
The engineering indicates the roof snow load at 20 PSF. By ordinance the minimum roof snow load is 25 PSF.
|
Intake Approval | | | 3/14/2016 | | FAIL |
|
|
|
Provide structural engineering
Planning letter
New Comchecks (not ledgible)
|
Application received | | | 3/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 2 2016 6:46AM
|