Permit Information
Permit NumberBLD16-00647
StatusFinaled
Name BELLA REMODELING LLC
Site Address 9931 W CABLE CAR ST Unit: 140
Project NameCoco Nail Bar
Customer NumberBLD15-01391
ePlanReviewNo
Description
(COCO NAIL BAR)DO NOT FINAL UNTIL BLD15-01391 IS COMPLETED. New 1,281 sq. ft. nail salon tenant within existing vacant shell space per approved plans. Work to include 1 hour demising walls per GAWP 3661, interior nonbearing walls to create 2 wax rooms, 1 break room, 1 storage room and 1 ADA restroom. This building is required to be fire spinklered per fire code for fire flow. This building will be required a compliant NFPA 13 system be installed prior to finalizing this permit.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/14/20174/13/2017 DONE
DetailsChristina Prado
mailed 4/14
Third Notice 2/18/20173/9/2017 DONE
DetailsChristina Prado
mailed 3/10/17
Second Notice 1/20/20172/13/2017 DONE
Mailed 2-14-17
First Notice 12/19/20161/10/2017 DONE
sent in mail 1-11-2017
BLD-Final12/9/201612/9/201612/9/2016PPASS
DetailsMike Jordan
Wong Phone #: ###-####. All issues resolved. Ok for perm occ.
Print Occupancy Form  12/9/2016 DONE
Permanent Occupancy  12/9/2016 DONE
BLD-Final12/7/201612/9/201612/8/2016PFAIL
DetailsMike Jordan
Hoang Phone #: ###-####. Provide ADA compliant restroom sign. Reflective surface for mirror to be 40 inches max above finish floor. Mount the tiolet paper dispenser per the approved plans. Provide ADA compliant POS. A portion of the WiFi bar to be ADA compliant per the approved plans. Plumbing final has also failed. A correction notice was posted.
FIRE-Final Inspection12/6/201612/7/201612/7/2016APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Conference11/7/201611/7/201611/7/2016PDONE
DetailsTroy Cobbley
I pointed out the need for a fire sprinkler permit for the required work. Looks like all of the existing uprights have been painted and many additional heads are needed.
BLD-Final9/20/20169/21/20169/21/2016ACANC
DetailsMike Jordan
Santiago// please call ahead Phone #: ###-####
BLD-Framing/Rough-in9/21/20169/21/20169/21/2016APASS
DetailsMike Jordan
Santiago// please call ahead Phone #: ###-####. Framing for new opening in demissing wall ok.
BLD-Framing/Rough-in8/30/20168/31/20168/31/2016APASS
DetailsMike Jordan
Santiogo Phone #: ###-####. Interior steel stud framed walls and hardlid ok. Noted that fire sprinkler work not started.
BLD-Framing/Rough-in8/11/20168/12/20168/12/2016ANR
DetailsMike Jordan
Santiago Phone #: ###-####. Needs MEP rough in inspections prior to framing inspection. Correction notice posted.
Issue PAID IN FULL permit  7/6/2016 DONE
Print Occupancy Form  7/6/2016 DONE
Plan assigned to (AJS)3/3/20163/3/20164/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
BLD review completed Level 3 TI - Paper - Coco Nail Bar
Routing - PLAN CHECK4/7/2016 4/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  4/8/2016 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/8/2016 DONE
Print Occupancy Form  4/8/2016 DONE
Permit Ready to Issue  4/8/2016 DONE
Need GC Form, Revised Cert of Value and RP
Telephone call  4/8/2016 DONE
called Richard to let know permit is ready and that we still need GC, rev cert of val & RP
Routing - FIRE3/31/20163/31/20164/7/2016 PASS
DetailsScott Arellano
Comments attached to plans.
1st review completed  4/7/2016 FAIL
Failed Mechanical and Plan Check
Plan resubmittals received  4/4/2016 DONE
Two copies of sheet A0.0, A1.0 and A2.0. Taken to Adele
Routing - MECHANICAL3/31/2016 3/31/2016 PASS
DetailsTroy James
Routing - PLAN CHECK3/10/2016 3/31/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLUMBING3/8/2016 3/10/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - MECHANICAL3/8/2016 3/8/2016 FAIL
DetailsTroy James
emailed corrections to architect
Routing - Erosion and Sediment3/3/2016 3/8/2016 CANC
DetailsEvan Jenkins
No ESC Permit Required
Routing - Addressing3/3/2016 3/3/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/3/2016 3/3/2016 PASS
DetailsJennifer Bruner
Pending Assignment by JCB3/3/2016 3/3/2016 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  3/2/2016 DONE
Intake Approval  3/2/2016 PASS
DetailsJavier Guzman
Recd Pcfee & Taken To Pln CK  3/2/2016 DONE
Application received 3/2/2016