Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD16-00651
StatusFinaled
Name ZACH BROWN
Site Address 2215 N 34TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan modification 6-14-16 Decided not to install the additional bathroom. Keep original closet that was for the room. Relocate door to bedroom at the end of the hall. Instead of using 2x6 furr out on existing 2x4 walls, wants to use 2x2 nailed to existing wall and fill cavity with 1 1/2" polystyrene to meet Energy Code. Wall to be covered with 1/2" gypsum board with tape, texture finish. See new floor plan and Owens Rigid foam insulation. *** Scope of work is to convert a portion of the old garage into 2 bedrooms and half bath. Electrical, HVAC if needed and plumbing permits will be pulled separately. Work will be performed per the approved plans, and local codes.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/13/20173/14/20173/14/2017ADONE
DetailsTony Young
Zach Phone #: ###-####-please call prior to meet
DOC - Permit Finaled3/14/20173/14/20173/14/2017PPASS
DetailsTony Young
done
BLD-Aging Inspection11/10/201611/10/201611/15/2016 PEND
DetailsTony Young
BLD-Aging Inspection11/9/201611/9/201611/15/2016 PEND
DetailsTony Young
BLD-Energy code compliance6/27/20166/28/20166/28/2016APASS
DetailsTony Young
would like call ahead; Zach Phone #: ###-####
BLD-Framing/Rough-in6/21/20166/22/20166/22/2016PPEND
DetailsTony Young
would like call ahead; Zach Phone #: ###-####,, ok to insulate pending electrical rough pass
Routing Walk-In (BLD)6/14/20166/14/20166/14/2016PDONE
DetailsBrian McGowan
Routing - PLAN CHECK6/14/2016 6/14/2016 PASS
DetailsBrian McGowan
Plan Modification
Case Summary (BLD)  6/14/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  6/14/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  6/14/2016 DONE
(F) Reprint permit  6/14/2016 DONE
CHANGE STATUS TO (ISS)  6/14/2016 DONE
Plan Mod
Plan Modification Accepted  6/14/2016 DONE
modification to the original plan
Routing Walk-In (BLD)3/2/20163/2/20163/2/2016APASS
DetailsDavid Ferguson
Plan assigned to (DAF)3/2/20163/2/20163/2/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/2/2016 3/2/2016 PASS
DetailsDavid Ferguson
Case Summary (BLD)  3/2/2016 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  3/2/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  3/2/2016 DONE
Permit Ready to Issue  3/2/2016 DONE
Needs GC Form, or Owner approval
Permit Ready to Issue  3/2/2016 DONE
Issue PAID IN FULL permit  3/2/2016 DONE
1st review completed  3/2/2016 DONE
DetailsDavid Ferguson
Application received 3/2/2016