First Notice | | 9/19/2016 | 10/17/2016 | | DONE |
|
|
|
Mailed 10-18-16
|
BLD-Final | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Dave Hannah
|
|
|
would like call ahead; Ben Phone #: ###-####
|
Permanent Occupancy | | | 9/9/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/9/2016 | | DONE |
|
|
|
|
BLD-Final | 8/24/2016 | 8/24/2016 | 8/24/2016 | A | PART |
Dave Hannah
|
|
|
Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen ok for temp occ
|
FIRE-Final Inspection | 8/24/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, commercial hood fire suppression system inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
Temporary Occupancy | 8/24/2016 | 11/22/2016 | 8/24/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Zoning Approval Temp | 8/24/2016 | 8/24/2016 | 8/24/2016 | | PASS |
Josh Wilson
|
|
|
Ok 30-day temp occ
|
BLD-Ceiling Grid Inspection | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Dave Hannah
|
|
|
Electrical grid inspection also called in for today PM. Please call Nic a half hour before inspection. Access to suite through back door in alley. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen
|
BLD-Conference | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Dave Hannah
|
|
|
Interior framing. Phone #: ###-#### Inspection requested via web by Nic van Diepen
|
BLD-Wall cover | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | PART |
Dave Hannah
|
|
|
Mechanical shafts fire taping. Please call Nic 1/2hr before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen int sheet rock ok
|
BLD-Framing/Rough-in | 6/21/2016 | 6/21/2016 | 6/22/2016 | P | PASS |
Dave Hannah
|
|
|
Roof platform and framing. If Nic not on site please call Ralph ###-#### or Karl ###-#### with Riverside (framers).Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen
|
BLD-Framing/Rough-in | 6/22/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Dave Hannah
|
|
|
Roof curb framing/bracing. Please call Nic when on site. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen
|
BLD-Conference | 6/17/2016 | 6/17/2016 | 6/17/2016 | A | DONE |
Dave Hannah
|
|
|
To discuss ''shaft'' fire rated wall/ceiling assembly. Please call 15 minutes before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen
|
BLD-Framing/Rough-in | 6/15/2016 | 6/15/2016 | 6/15/2016 | A | CANC |
Dave Hannah
|
|
|
Mech shaft framing. Please call Nic 1/2 hr before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen part basement walls ok to cover
|
Issue PAID IN FULL permit | | | 5/23/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/23/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 5/19/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 3/30/2016 | 3/30/2016 | 5/19/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 3 TI - ePlanReview - Eureka!
|
Routing - PLAN CHECK | 5/19/2016 | | 5/19/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/19/2016 | | DONE |
Christina Prado
|
|
|
Need RP, GC Form & Revised certificate of value for issuance
|
Routing - PLAN CHECK | 5/11/2016 | | 5/16/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 5/11/2016 | 5/11/2016 | 5/12/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to plans.
|
Routing - MECHANICAL | 5/11/2016 | | 5/12/2016 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 5/10/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
emailed applicant, recieved resubmittal task but applicant signed off prior to all of the sheets being uploaded. I have emailed him to get the sheets sent to christina to fix the error they created. The e plan system shows error messages for all of the sheets that partially uploaded.
|
1st review completed | | | 4/26/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 3/30/2016 | | 4/26/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - C.D.H | 3/30/2016 | | 4/26/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 3/30/2016 | 3/30/2016 | 4/5/2016 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
Routing - PLUMBING | 3/30/2016 | | 4/4/2016 | | PASS |
Bill VanDegrift
|
|
|
May require an RPBP on make up air unit.
|
Routing PW Environmental | 3/30/2016 | | 4/4/2016 | | PASS |
Terry Alber
|
|
|
Big Dipper must be on routine maintenance schedule to ensure continued proper operation.
|
Routing - PUBLIC WORKS | 3/30/2016 | | 3/31/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 3/30/2016 | | 3/31/2016 | | PASS |
Josh Wilson
|
|
|
ok per DRH16-00013
|
Routing PW Sewer Rating | 3/30/2016 | | 3/31/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 3/30/2016 | | 3/31/2016 | | FAIL |
Troy James
|
|
|
|
Intake Approval | | | 3/30/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Westfall and plan review fee paid.
|
Routing - Erosion and Sediment | 3/30/2016 | | 3/30/2016 | | PASS |
Evan Jenkins
|
|
|
(EUREKA!)(SUITE ???) Remodel to open a new full service sit down restaurant tenant in a 4,108 sq. ft. space in existing building per approved plans.
|
Routing - Addressing | 3/30/2016 | | 3/30/2016 | | PASS |
Laura Hunter
|
|
|
Edited suite number to Ste 120
|
Plan Reviewer's activity | | | 3/29/2016 | | PASS |
|
|
|
Plan intake approved
|
Intake Approval | | | 3/11/2016 | | FAIL |
Carl Westfall
|
|
|
CDHD forms uploaded. Structural documents and approval to project over CCDC property missing.
|
Intake Approval | | | 3/9/2016 | | FAIL |
|
|
|
Nothing new uploaded. See the markups on the plan intake checklist.
|
Intake Approval | | | 3/4/2016 | | FAIL |
|
|
|
See the circled items on the plan intake checklist. Please provide information, drawings, etc as noted.
|
Application received | | | 3/3/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 3 2016 1:17PM
|
Pending Assignment by JCB | 3/30/2016 | | | | |
Jason Blais
|
|
|
|