Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberBLD16-00669
StatusFinaled
Name TKO CUSTOM HOMES BOISE LLC
Site Address 2412 W TARGEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan modification - engineering to verify alternate roofing construction and fix to make wall under stairs structural by reinforcing the foundation under wall. 5-10-16 DAF** Permit to DEMO existing single family home and construct a new 1875 sq. ft., two story (first story 1405 sq. ft., second story 470 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 51 sq. ft. of covered patio/porch and a 476 sq. ft. attached garage per the approved plans, and any notations. R-1C zoning and setbacks per planning. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/30/20167/1/20167/1/2016PPASS
DetailsJim Storey
TJ-please call for access Phone #: ###-####
DOC - Permit Finaled7/1/20167/1/20167/1/2016PPASS
DetailsJim Storey
BLD-Energy code compliance5/12/20165/13/20165/12/2016APASS
DetailsJim Storey
Robert Phone #: ###-####
BLD-Framing/Rough-in5/11/20165/11/20165/11/2016PPASS
DetailsJim Storey
Phone #: ###-####
(F) Reprint permit  5/11/2016 DONE
CHANGE STATUS TO (ISS)  5/11/2016  
Case Summary (BLD)  5/10/2016 DONE
DetailsDavid Ferguson
Plan assigned to (DAF)5/5/20165/5/20165/5/2016 FAIL
DetailsDavid Ferguson
Hand stacked roof not built to conventional framing practices per Jim Storey. Told TKO to submit engineered drawing of how it was actually framed.
Plan Modification Accepted  5/5/2016 DONE
plan mod submitted 2 sets of sheet 3 of 5-gave to Dave F
BLD-Framing/Rough-in5/3/20165/4/20165/4/2016PFAIL
DetailsJim Storey
Robert Phone #: ###-#### c/n on site
BLD-Wall Bracing4/12/20164/13/20164/13/2016APASS
DetailsJim Storey
Robert Phone #: ###-####
BLD-Footing3/29/20163/30/20163/30/2016PPASS
DetailsJim Storey
Pat Phone #: ###-#### rebar onley in pf
Issue PAID IN FULL permit  3/21/2016 DONE
OVERRIDE  3/17/2016  
Plan assigned to (DAF)3/8/20163/8/20163/17/2016 DONE
DetailsDavid Ferguson
due 3/17
1st review completed  3/17/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  3/17/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  3/17/2016 DONE
Permit Ready to Issue  3/17/2016 DONE
All Met
Inspection Record Card- Bld  3/17/2016 DONE
Telephone call  3/17/2016 DONE
called TJ to let know permit is ready and how much is owed
Routing - PLAN CHECK3/8/2016 3/17/2016 PASS
DetailsDavid Ferguson
Routing - MECHANICAL  3/8/2016 PASS
DetailsTroy James
Plan assigned to (LEG) Tisha3/3/2016 3/8/2016 DEFR
DetailsTisha Gallop
Route to Impact Fee Review3/3/20163/6/20163/4/2016 PASS
DetailsCindy M. Gould
Plans ACCEPTED BY PLAN TECH  3/3/2016 DONE
Intake Approval  3/3/2016 PASS
Recd Pcfee & Taken To Pln CK  3/3/2016 DONE
Routing - PLANNING3/3/2016 3/3/2016 PASS
DetailsSue Cummings
Routing - Addressing3/3/2016 3/3/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/3/2016 3/3/2016 PASS
DetailsRachael Beierle
Application received 3/3/2016