BLD-Foundation | 12/1/2017 | 12/8/2017 | 12/8/2017 | P | PART |
Jim Sly
|
|
|
rebar // Kay Phone #: ###-#### Pad.....includes #4 rebar on 18" x 18" grid. OK
|
BLD-Foundation | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Mike Jordan
|
|
|
Kay Phone #: ###-####
|
BLD-Footing | 4/21/2016 | 4/25/2016 | 4/25/2016 | A | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
Plan assigned to (LEG) Tisha | 4/13/2016 | | 4/15/2016 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 4/13/2016 | | 4/15/2016 | | PASS |
Tisha Gallop
|
|
|
minor modification to engineered foundation, see attached engineered plans. No plan mod fee due.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/15/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/15/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2016 | | DONE |
|
|
|
Called Kay Carter and told him to come pick up approved plan mod, no fee.
|
Plan Modification Accepted | | | 4/13/2016 | | DONE |
|
|
|
plan mod received USB drive port and 1 set of sheets S0.01, S2.02, S0.03, S1.01, S5.01, S5.02, S5.06-took to Tisha
|
OVERRIDE | | | 3/21/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/21/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/21/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/21/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 3/18/2016 | | 3/21/2016 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 3/18/2016 | | DONE |
|
|
|
received (2) sets of calculations, footing, and structural plans
|
Routing Walk-In (BLD) | 3/7/2016 | 3/7/2016 | 3/7/2016 | A | FAIL |
Tisha Gallop
|
|
|
needs foundation plan and calcs done by idaho licensed engineer
|
Routing Walk-In (Zoning) | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | FAIL |
Tisha Gallop
|
|
|
needs engineered foundation and to meet energy code.
|
1st review completed | | | 3/3/2016 | | FAIL |
|
|
|
|
Application received | | 3/3/2016 | | | |
|
|
|
|