Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-00674
StatusFinaled
Name TAHOE HOMES LLC
Site Address 6948 E HIGHLAND VALLEY RD
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan mod 4/8/16, WUI Valley perimeter, Zone A requirements//leg** WUI Valley, Zone "B", Class "A" roof required. Permit for the construction of a new 2,838 sq. ft., one story single family dwelling with 4 bedrooms, 3 bathrooms, approximately 334 sq. ft. of covered patio/porch and a 1,110 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C/DA zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/11/20168/16/20168/16/2016APASS
DetailsPhil Shearer
Clint Phone #: ###-####
DOC - Permit Finaled8/16/20168/16/20168/16/2016PPASS
DetailsPhil Shearer
BLD-Energy code compliance6/21/20166/23/20166/23/2016APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in6/16/20166/21/20166/21/2016APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other5/20/20165/20/20165/20/2016PPASS
DetailsPhil Shearer
Rudy// fire soffit insp. Phone #: ###-####
BLD-Wall Bracing5/17/20165/18/20165/18/2016APASS
DetailsPhil Shearer
Shear // Rudy Phone #: ###-####
BLD-Conference4/20/20164/20/20164/20/2016APASS
DetailsPhil Shearer
Need to verify all setbacks from property lines for complaining property. Setbacks are good as per plans.
BLD-Foundation4/8/20164/11/20164/11/2016APASS
DetailsPhil Shearer
Alvaro Phone #: ###-####
Plan Modification Accepted  4/8/2016 DONE
added WUI Zone A requirements to plans
Routing - PLAN CHECK4/8/2016 4/8/2016 PASS
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  4/8/2016 DONE
BLD-Footing4/7/20164/7/20164/7/2016PPASS
DetailsPhil Shearer
Avarro Phone #: ###-####
BLD-Footing4/6/20164/6/20164/6/2016PCANC
DetailsPhil Shearer
Alvaro-pour time 4:00 Phone #: ###-####
Issue PAID IN FULL permit  3/22/2016 DONE
OVERRIDE  3/15/2016  
Plan assigned to (BJM)3/8/20163/8/20163/15/2016 DONE
DetailsBrian McGowan
3/17
1st review completed  3/15/2016 DONE
DetailsBrian McGowan
Case Summary (BLD)  3/15/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/15/2016 DONE
Permit Ready to Issue  3/15/2016 DONE
All Met
Inspection Record Card- Bld  3/15/2016 DONE
Telephone call  3/15/2016 DONE
called Loenard t let know permit is ready-left message
Routing - PLAN CHECK3/8/2016 3/15/2016 PASS
DetailsBrian McGowan
Plan assigned to (LEG) Tisha3/3/2016 3/8/2016 DEFR
DetailsTisha Gallop
Routing - MECHANICAL3/4/2016 3/8/2016 PASS
DetailsTroy James
Routing - Addressing3/3/2016 3/4/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/3/2016 3/4/2016 PASS
DetailsRachael Beierle
Routing - PLANNING3/4/2016 3/4/2016 PASS
DetailsColleen T Carroll
Plans ACCEPTED BY PLAN TECH  3/3/2016 DONE
Intake Approval  3/3/2016 PASS
Recd Pcfee & Taken To Pln CK  3/3/2016 DONE
Application received 3/3/2016