Permit Information
Permit NumberBLD16-00679
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 333 N 1ST ST
Project NameSLMOP Womens Health Assoc.
Customer Number 
ePlanReviewNo
Description
(SLMOP – WOMEN’S HEALTH ASSOCIATES – SUITE 240) The fire sprinkler system is used for building area increase. To remodel portions of an existing 10,450 square foot medical office tenant space located on the 2nd story of the St. Luke’s Medical Office Plaza. A 208 square foot nurse’s station will be remodeled, a 194 square foot treatment room will be converted to an office, a 105 square foot office will be converted to an exam room, a nurse’s station and a portion of the waiting room will be converted to a 138 square foot blood draw room, an area will be remodeled to create two work rooms (one 70 square feet and one 67 square feet), and 197 square feet of hallway will be remodeled (979 square feet total). Work includes removing some interior nonbearing walls, constructing some interior nonbearing walls, reversing a door swing, millwork, carpet, sheet vinyl flooring, and finishes. The existing common corridor located outside of this tenant space is not affected by this remodel. The hallway located within this tenant space is not required to be fire-resistance-rated. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  4/4/2018 DONE
Paper drawings taken to records
Third Notice 9/24/20179/21/2017 DONE
This permit finaled on the web by Curtis Weedop
Third Notice 8/15/20179/19/2017 DONE
DetailsChristina Prado
Emailed 9/19/2017
Third Notice 7/17/20178/10/2017 DONE
Mailed 8-11-17
Third Notice 6/17/20177/12/2017 DONE
Mailed 7-13-17
Third Notice 5/15/20176/12/2017 DONE
Mailed 6-13-17
Second Notice 4/23/20175/10/2017 DONE
sent in mail 5-11-17
First Notice3/31/20173/31/20174/13/2017 DONE
DetailsDave Hannah
emailed to St Lukes contact 4/13
BLD-Final3/30/20173/31/20173/31/2017APASS
DetailsDave Hannah
Daryl Phone #: ###-####
DOC - Permit Finaled3/31/20173/31/20173/31/2017PPASS
DetailsDave Hannah
BLD-Final3/17/20173/20/20173/20/2017AFAIL
DetailsDave Hannah
Daryl Phone #: ###-#### needs to change door swing
FIRE-Final Inspection3/16/20173/17/20173/17/2017APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIRE-Final Inspection1/11/20171/12/20171/12/2017ACANC
DetailsJim Page
Inspection request for life safety cancelled, FIR permit for alarms in issued status and not ready for inspection.
BLD-Framing/Rough-in11/8/201611/9/201611/10/2016APASS
DetailsDave Hannah
Daryl Phone #: ###-####
BLD-Ceiling Grid Inspection9/27/20169/28/20169/28/2016APASS
DetailsDave Hannah
Daryl Phone #: ###-####
BLD-Framing/Rough-in9/8/20169/9/20169/9/2016APART
DetailsDave Hannah
Darrell Phone #: ###-####
BLD-Framing/Rough-in7/20/20167/21/20167/21/2016APART
DetailsDave Hannah
Daryl Phone #: ###-#### phase one ok
Issue PAID IN FULL permit  4/1/2016 DONE
Plan assigned to (CJW)3/4/20163/4/20163/16/2016 PASS
DetailsCarl Westfall
(Mar 14 - 7 days) St. Lukes Woments heath
Routing - PLAN CHECK3/4/2016 3/16/2016 PASS
DetailsCarl Westfall
IBC plan review completed
1st review completed  3/16/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/16/2016 DONE
Permit Ready to Issue  3/16/2016 DONE
All Met
Inspection Record Card- Bld  3/16/2016 DONE
Telephone call  3/16/2016 DONE
notified customer that permit is ready
Routing - PLUMBING  3/4/2016 PASS
per plans and ISPC
Routing - Addressing3/4/2016 3/4/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/4/2016 3/4/2016 PASS
Intake Approval  3/4/2016 PASS
DetailsCarl Westfall
OK to submit for Level 2 TI
Plans ACCEPTED BY PLAN TECH  3/4/2016 DONE
Recd Pcfee & Taken To Pln CK  3/4/2016 DONE
Application received 3/4/2016