BLD-Aging Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/22/2017 | 8/22/2017 | 8/23/2017 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jennifer Sims
|
BLD-Final | 2/22/2017 | 2/23/2017 | 2/23/2017 | P | PEND |
Dave Hannah
|
|
|
Inspection requested via web by Jennifer Sims needs a handrail on stairs going to second story and returns on handrail on stairs into basement also needs a perment laddder in window well for badrooms
|
BLD-Aging Inspection | 2/17/2017 | 2/17/2017 | 2/17/2017 | | CANC |
Tony Young
|
|
|
|
BLD-Conference | 2/14/2017 | 2/17/2017 | 2/17/2017 | P | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jennifer Sims Inspection cancelled from web by: Jennifer Sims
|
Zoning Approval | 12/8/2016 | 12/8/2016 | 12/8/2016 | | PASS |
Ted Vanegas
|
|
|
|
BLD-Conference | 12/5/2016 | 12/7/2016 | 12/7/2016 | A | PART |
Tony Young
|
|
|
Will Phone #: ###-####,, ?s on final,, need trades, historical,, life saftey, etc
|
Telephone call | | | 11/23/2016 | | DONE |
|
|
|
Left a message for Jennifer, ###-####, informing her that since we did not receive letter stating her terminating their legal relationship with the GC that the permit has gone back to TKO. Also called TKO informing them the permit is back under their company.
|
Telephone call | | | 11/23/2016 | | DONE |
|
|
|
Left a message for TJ that the homeowner brought in the terminating their legal relationship with the GC and that the permit is under the homeowner now.
|
Telephone call | | | 11/22/2016 | | DONE |
Rita DeYoung
|
|
|
Called ###-#### left message for Jennifer that we need the letter terminating their legal relationship with the GC.
|
Telephone call | | | 11/21/2016 | | DONE |
Rita DeYoung
|
|
|
Called ###-#### left message with husband for Jennifer (parcel owner) that we need the letter terminating their legal relationship with the GC.
|
(F) Reprint permit | | | 11/14/2016 | | DONE |
|
|
|
|
Meeting | | | 11/14/2016 | | DONE |
Rita DeYoung
|
|
|
Parcel owner came in to have the permit transfered into Jennifer Sims name. TJ voice mail is full ###-####. I am waiting on the letter from the parcel owner Jennifer that they have terminated their legal relationship with GC
|
BLD-Energy code compliance | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | PASS |
Phil Shearer
|
|
|
TJ Phone #: ###-####
|
BLD-Framing/Rough-in | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Tony Young
|
|
|
TJ Sayers from Tko Phone #: ###-#### Inspection requested via web by T.J. Sayers
|
BLD-Framing/Rough-in | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | NR |
Tony Young
|
|
|
TJ Sayers from Tko Phone #: ###-#### Inspection requested via web by T.J. Sayers,, need seal package 1st,, see paint
|
Plan Modification Accepted | | | 8/30/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/30/2016 | | 8/30/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Conference | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | PASS |
Tony Young
|
|
|
RC Phone #: ###-####,, wanting frame walk through,, call 1st,, looking ok
|
BLD-Conference | 8/2/2016 | 8/2/2016 | 8/2/2016 | P | NH |
Tony Young
|
|
|
RC Phone #: ###-####
|
BLD-Conference | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | DEFR |
Tony Young
|
|
|
RC Phone #: ###-####,, defr to pm
|
BLD-Footing | 6/3/2016 | 6/6/2016 | 6/6/2016 | A | PASS |
Tony Young
|
|
|
Deon Phone #: ###-####,, detached office
|
BLD-Conference | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PEND |
Tony Young
|
|
|
Neighbor concerned about their existing footing near excavation. Dan @ ###-####,, sent pictures to JT, BA, AL
|
BLD-Foundation | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | PART |
Tony Young
|
|
|
Sergio Phone #: ###-####,, work in progress on basement walls,, ok
|
BLD-Footing | 5/6/2016 | 5/6/2016 | 5/6/2016 | P | PART |
Tony Young
|
|
|
Serio Phone #: ###-####,, basement,, work in progress
|
Issue PAID IN FULL permit | | | 4/13/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/22/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 3/8/2016 | 3/8/2016 | 3/22/2016 | | DONE |
David Ferguson
|
|
|
due 3/18 - Need clarification on basement wall details B & F
|
Routing - PLAN CHECK | 3/22/2016 | | 3/22/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/22/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/22/2016 | | DONE |
|
|
|
all requirements met
|
Inspection Record Card- Bld | | | 3/22/2016 | | DONE |
|
|
|
|
Telephone call | | | 3/22/2016 | | DONE |
|
|
|
called Jennifer Sims to ask about this permit. They have a new permit for a nsfd but BLD 15-01880 is still open and it doesn't say anything about the existing home being demo'd-she called back asked me to call TJ @ TKP custom homes
|
Telephone call | | | 3/22/2016 | | DONE |
|
|
|
talked to TJ with TKO and told him we were voiding the first permit # BLD15-01880. For this permit we are adding the demo portion of BLD15-01880 permit w/valuation. the home was originally going to be partially demo'd and and extensive remodel done. The demo went to far and customer was told they needed to submit drawings for a nsfd
|
1st review completed | | | 3/18/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/9/2016 | | 3/18/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLANNING | 3/8/2016 | | 3/18/2016 | | PASS |
Matthew A Halitsky
|
|
|
|
Routing - MECHANICAL | 3/8/2016 | | 3/9/2016 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 3/4/2016 | 3/7/2016 | 3/8/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 3/4/2016 | | 3/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 3/8/2016 | | PASS |
|
|
|
|
Routing - Design Review | 3/8/2016 | | 3/8/2016 | | PASS |
Matthew A Halitsky
|
|
|
See redlines.
|
Plan assigned to (LEG) Tisha | 3/4/2016 | | 3/8/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/4/2016 | | DONE |
|
|
|
|
Intake Approval | | | 3/4/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/4/2016 | | DONE |
|
|
|
|
Application received | | 3/4/2016 | | | |
|
|
|
|