Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD16-00685
StatusFinaled
Name GENERAL DYNAMICS INFORMATION TECHNO
Site Address 3309 N COLE RD
Project NameAT&T Cell Tower Ustick & Cole
Customer Number 
ePlanReviewYes
Description
(AT&T MANPOLE CELL TOWER – USTICK AND COLE) Permit for the modifications to the existing manpole cell tower with work to include: removal of (3) Powerwave P65-18-xxw2-m Antenna and replace with (3) Andrew DBXNH-8585B-R2M Antenna, removal of (3) Powerwave 7750 Antenna and replace with (3) Andrew SBNHH-1D65C, adding (3) RRH-1900 and adding inside of existing equipment structure a 48VDC battery rack and replace an existing gel celled batteries. No changes to the height of the tower and minor equipment modification to interior of existing equipment structure. Structural engineering and plans provided. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/5/20168/8/20168/9/2016APASS
DetailsJim Sly
call ahead for access; Chrystal Phone #: ###-####
DOC - Permit Finaled8/9/20168/9/20168/9/2016PPASS
DetailsJim Sly
Issue PAID IN FULL permit  3/25/2016 DONE
Inspection Record Card- Bld  3/25/2016 DONE
Plan assigned to (JG)3/14/20163/14/20163/18/2016 PASS
DetailsJavier Guzman
AT&T USTICK AND COLE
Routing - PLAN CHECK3/14/2016 3/18/2016 PASS
DetailsJavier Guzman
1st review completed  3/18/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  3/18/2016 DONE
Permit Ready to Issue  3/18/2016 DONE
DetailsChristina Prado
Need GC Form & Revised certificate of value for issuance
Routing - FIRE3/15/20163/15/20163/15/2016 PASS
DetailsKatie Marron
No comments attached.
Routing - Addressing3/14/2016 3/15/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/14/2016 3/15/2016 PASS
DetailsRachael Beierle
Routing - PLANNING3/14/2016 3/14/2016 PASS
DetailsCeline Acord
Intake Approval  3/14/2016 FAIL
DetailsDavid Ferguson
Need stamped structural calcs
Intake Approval  3/14/2016 PASS
DetailsDavid Ferguson
Application received  3/4/2016 DONE
Application submitted via PDS Online on Mar 4 2016 11:20AM
First Notice8/9/20168/9/2016   
DetailsJim Sly