BLD-Final | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Conference | 3/9/2016 | 3/11/2016 | 3/11/2016 | P | DONE |
Phil Shearer
|
|
|
Daniel Phone #: ###-####
|
DOC - Permit Finaled | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Phil Shearer
|
|
|
|
Routing - PLAN CHECK | 3/7/2016 | | 3/9/2016 | | PASS |
Tisha Gallop
|
|
|
WUI Zone A exemption e-mail from fire dept attahced in documents. No subgrade inspection required per Jason Taylor, Public Works.
|
Plan assigned to (LEG) Tisha | 3/7/2016 | | 3/9/2016 | | DONE |
Tisha Gallop
|
|
|
walk in hillside addition (done prior to permit) need WUI approval not meet
|
1st review completed | | | 3/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/9/2016 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 3-9-16 /CEV
Need GC Form
|
Inspection Record Card- Bld | | | 3/9/2016 | | DONE |
|
|
|
|
Telephone call | | | 3/9/2016 | | DONE |
|
|
|
***3/9/16-requirements met**** Left a message for Daniel informing him that his permit is ready, the amount that is due and that he will need to fill out a 302 for issuance
|
Issue PAID IN FULL permit | | | 3/9/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/7/2016 | 3/7/2016 | 3/7/2016 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | CANC |
Tisha Gallop
|
|
|
took in as level 2
|
Routing Walk-In (PW Hillside) | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Jason C. Taylor
|
|
|
As structure is already built and the foundation pictures show the footings were placed upon bedrock, there are no requirements for this addition from hillside review. JCT
|
Application received | | 3/7/2016 | | | |
|
|
|
|