Permit for 240 sq. ft. addition of conditioned sunroom to existing dwelling with electric heating separate of the main dwelling. This structure was constructed prior to obtaining permit, approximately around 2002, and will be inspected to meet current codes. WUI Zone A exception approved by fire department for exterior covering and soffits. Separate electrical permit is required. All work is to be done according to approved plans, ResCheck, Plan Review Report and current local codes. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/11/20163/11/20163/11/2016PPASS
DetailsPhil Shearer
BLD-Conference3/9/20163/11/20163/11/2016PDONE
DetailsPhil Shearer
Daniel Phone #: ###-####
DOC - Permit Finaled3/11/20163/11/20163/11/2016PPASS
DetailsPhil Shearer
Routing - PLAN CHECK3/7/2016 3/9/2016 PASS
DetailsTisha Gallop
WUI Zone A exemption e-mail from fire dept attahced in documents. No subgrade inspection required per Jason Taylor, Public Works.
Plan assigned to (LEG) Tisha3/7/2016 3/9/2016 DONE
DetailsTisha Gallop
walk in hillside addition (done prior to permit) need WUI approval not meet
1st review completed  3/9/2016 DONE
Inspection Record Card- Bld  3/9/2016 DONE
Inspection Record Card- Bld  3/9/2016 DONE
Inspection Record Card- Bld  3/9/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/9/2016 DONE
Permit Ready to Issue  3/9/2016 DONE
***ALL REQUIRMENTS MET 3-9-16 /CEV
Need GC Form
Inspection Record Card- Bld  3/9/2016 DONE
Telephone call  3/9/2016 DONE
***3/9/16-requirements met**** Left a message for Daniel informing him that his permit is ready, the amount that is due and that he will need to fill out a 302 for issuance
Issue PAID IN FULL permit  3/9/2016 DONE
Routing Walk-In (Zoning)3/7/20163/7/20163/7/2016APASS
DetailsSue Cummings
Routing Walk-In (BLD)3/7/20163/7/20163/7/2016PCANC
DetailsTisha Gallop
took in as level 2
Routing Walk-In (PW Hillside)3/7/20163/7/20163/7/2016PPASS
DetailsJason C. Taylor
As structure is already built and the foundation pictures show the footings were placed upon bedrock, there are no requirements for this addition from hillside review. JCT