Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00704
StatusFinaled
Name BASE CONSTRUCTORS
Site Address 4913 W HILLSIDE AVE
Project NameHillside Addition
Customer Number 
ePlanReviewYes
Description
WUI Foothills, Zone "A" requirements for new construction apply, class "A" roof required. Master Bedroom Addition and covered rear patio. Separate electrical, mechanical and plumbing permits are required. Prescriptive Energy Code proposed. All work to be done according to plans, review notes, notes and local codes. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/29/20169/30/20169/30/2016PPASS
DetailsTony Young
Access is around right side to door off rear porch - there are no dogs, fence is to keep stray and deer out. Plans on site in bay window. Phone #: ###-#### Inspection requested via web by Andrew George
DOC - Permit Finaled9/30/20169/30/20169/30/2016PPASS
DetailsTony Young
BLD-Final9/28/20169/29/20169/29/2016ANR
DetailsTony Young
Access is around right side to door off rear porch - there are no dogs, fence is to keep stray and deer out. Plans on site in bay window. Phone #: ###-#### Inspection requested via web by Andrew George,, ok pending plumbing final
BLD-Energy code compliance6/28/20166/28/20166/28/2016PPASS
DetailsTony Young
Reinspect the air seal, framing corrections and energy code - all competed and plans on site, access is from the west side - walk around and enter through door on rear patio, hog wire fence is to keep dogs out of yard not in yard so no pets on site - thanks Tony Phone #: ###-#### Inspection requested via web by Andrew George
BLD-Framing/Rough-in6/21/20166/22/20166/22/2016APART
DetailsTony Young
Plans are on site. Access is on west side and go around. I do not see where framer coordinated shear inspection - if we need to remove Tyvek please advise. AC unit inside room is being relocated to outside once shell is sealed up. Window missing was damaged at shipping and arriving Tuesday

Thanks. Phone #: ###-#### Inspection requested via web by Andrew George,, need to add blocking for shear and nail off,, need to verify seal pack,, need hold down on porch trusses,, strap top plates,, new to existing and where not overlapped 24",, ok to insulate
BLD-Framing/Rough-in6/21/20166/22/20166/21/2016PCANC
DetailsTony Young
Access through area of new construction on west side of house, plans on site Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George
BLD-Conference6/21/20166/22/20166/21/2016ACANC
DetailsTony Young
Plans on site, enter from west side and go around.
I do not see that my framer coordinated shear panel inspection, if we need to remove tyvek we will please advise.
AC inside unit is moving to outside once sealed up. A window was damaged upon arrival and is to be installed in one week. Thanks. Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George
BLD-Footing6/1/20166/2/20166/2/2016APASS
DetailsTony Young
Support columns - Kevin Phone #: ###-####
BLD-Foundation5/13/20165/16/20165/16/2016APART
DetailsTony Young
Kevin Phone #: ###-####,, work in progress
BLD-Footing5/12/20165/13/20165/13/2016APASS
DetailsDave Hannah
Andrew Phone #: ###-####
BLD-Footing5/10/20165/11/20165/11/2016ACANC
DetailsTony Young
Can we coordinate a footing inspection for 11-12? We have mud scheduled for 1pm. Its only a 24x24 area to look at. Thanks!! Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George
Issue PAID IN FULL permit  5/6/2016 DONE
OVERRIDE  4/13/2016  
Plan assigned to (BJM)3/9/20163/9/20164/13/2016 DONE
DetailsBrian McGowan
Failed flood plain
Routing - PLAN CHECK4/13/2016 4/13/2016 PASS
DetailsBrian McGowan
Routing PW Flood Plain4/13/2016 4/13/2016 PASS
DetailsJim Wyllie
Improvement value was less than market value of structure. Floodplain requirements do not apply.

Jim W. / ###-####
PLANS/APPL TAKEN TO FRONT DESK  4/13/2016  
DetailsBrian McGowan
Energy - Yes
ESC - Yes
Permit Ready to Issue  4/13/2016 DONE
DetailsChristina Prado
Need RP for issuance
Routing - PLANNING3/9/2016 4/12/2016 PASS
DetailsSue Cummings
Routing - PLAN CHECK3/9/2016 4/7/2016 FAIL
DetailsBrian McGowan
Need WUI foothills details
1st review completed  4/7/2016 FAIL
DetailsBrian McGowan
Must meet foothills WUI requirements. Need details
Routing PW Flood Plain3/9/2016 3/17/2016 FAIL
DetailsJim Wyllie
Applicant shall provide the following information:
What is the current market value of the structure?
What is the value of the proposed building improvements excluding costs for the new covered patio?
Jim Wyllie / ###-####
Plans ACCEPTED BY PLAN TECH  3/9/2016 DONE
DetailsChristina Prado
Intake Approval  3/9/2016 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  3/9/2016 DONE
DetailsChristina Prado
Application received  3/7/2016 DONE
Application submitted via PDS Online on Mar 7 2016 11:49AM
Intake Approval  3/7/2016 FAIL
DetailsChristina Prado
Need full floor plan and possibly and Elevation Certificate. Contact Jim Wyllie at ###-#### for more details.

Christina ###-####