BLD-Final | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | PASS |
Mike Jordan
|
|
|
Rich-fire final to be done pm today as well Phone #: ###-####. oK FOR PERM OCC.
|
FIRE-Final Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 4/20/2016 | | DONE |
|
|
|
see BLD16-01197 for perm c of o
|
BLD-Conference | 3/21/2016 | 3/22/2016 | 3/22/2016 | A | DONE |
Mike Jordan
|
|
|
Kim-- she wants a conference to go over what is needed Phone #: ###-####. Needs to submit new floor plan. Noted work was done without permits by previous tenant. Additional walls have been constructed, creating an office, storage area and two dressing rooms. Walls are not full height, 8ft. Noted to tenant that an architect may be needed.
|
BLD-Conference | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | NR |
Mike Jordan
|
|
|
Kim Phone #: ###-####. Fire/life/afety failed.
|
FIRE-Final Inspection | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide sticker at the main exit, provide revised floor plan to plan review, provide exit signs and emergency lighting as discussed, provide ADA hardware on the rear exit door, remove the thumbturn dead bolts from the rear exit doors.
|
BLD-Final | 3/18/2016 | 3/21/2016 | 3/21/2016 | P | CANC |
Mike Jordan
|
|
|
Kim Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/18/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 3/7/2016 | 3/7/2016 | 3/10/2016 | | PASS |
Javier Guzman
|
|
|
3/11 L2 Into Tennis, Occ Eval Paper
|
Routing - PLAN CHECK | 3/8/2016 | | 3/10/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 3/10/2016 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 3/10/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/10/2016 | | DONE |
|
|
|
requirements met
|
Print Occupancy Form | | | 3/10/2016 | | DONE |
|
|
|
|
Telephone call | | | 3/10/2016 | | DONE |
|
|
|
called Kim- left message that permit is ready
|
Routing - Addressing | 3/7/2016 | | 3/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/8/2016 | | 3/8/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/7/2016 | | DONE |
|
|
|
|
Intake Approval | | | 3/7/2016 | | PASS |
|
|
|
as per Javier Guzman
|
Recd Pcfee & Taken To Pln CK | | | 3/7/2016 | | DONE |
|
|
|
|
First Notice | | 4/30/2016 | | | |
|
|
|
|
Application received | | 3/7/2016 | | | |
|
|
|
|