Permit Information
Permit NumberBLD16-00720
StatusFinaled
Name B WHITING CONSTRUCTION LLC
Site Address 6942 W STATE ST
Project NameContinental Load
Customer Number 
ePlanReviewNo
Description
(CONTINENTAL LOAN – CENTER TENANT SPACE) This building does not have a fire sprinkler system. To remodel an existing 900 square foot tenant space for a new loan office. The building has a total floor area of about 4,000 square feet. The other two tenants in this building are B Occupancy food service establishments. Work is to include removing an interior nonbearing wall and constructing a new interior nonbearing wall. The restroom is required to be maintained accessible to the disabled as defined by the 1992 ADA. If compliant with that standard, no accessible upgrades to the restroom are required. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/17/20165/12/2016 DONE
Mailed 5-13-16
BLD-Final4/7/20164/7/20164/7/2016PPASS
DetailsTony Young
Oren Phone #: ###-####
FIRE-Final Inspection4/7/20164/7/20164/7/2016PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete.
BLD-Final4/6/20164/7/20164/7/2016ANR
DetailsTony Young
Oren Phone #: ###-####,, needs fls 1st
Print Occupancy Form  4/7/2016 DONE
Permanent Occupancy  4/7/2016 DONE
BLD-Framing/Rough-in3/15/20163/16/20163/16/2016APASS
DetailsTony Young
Bill Phone #: ###-####
Issue PAID IN FULL permit  3/14/2016 DONE
Plan assigned to (CJW)3/8/20163/8/20163/11/2016 PASS
DetailsCarl Westfall
(Mar 10 - 3 days)
Routing - PLAN CHECK3/9/2016 3/11/2016 PASS
DetailsCarl Westfall
1st review completed  3/11/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/11/2016 DONE
Permit Ready to Issue  3/11/2016 DONE
Need a GC Form. GC turned in the application and plans
Print Occupancy Form  3/11/2016 DONE
Telephone call  3/11/2016 DONE
called Bill- told him permit is ready, fees due, and that we need GC form
Routing - Addressing3/8/2016 3/9/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/9/2016 3/9/2016 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  3/8/2016 DONE
Intake Approval  3/8/2016 PASS
Recd Pcfee & Taken To Pln CK  3/8/2016 DONE
Application received 3/8/2016