Third Notice | | 2/18/2017 | 2/15/2017 | | DONE |
|
|
|
This permit finaled on the web by kevin debelloy
|
Third Notice | | 1/16/2017 | 2/13/2017 | | DONE |
Christina Prado
|
|
|
Mailed 2/13/17
|
Third Notice | | 12/17/2016 | 1/11/2017 | | DONE |
|
|
|
|
Second Notice | | 11/24/2016 | 12/12/2016 | | DONE |
|
|
|
Mailed 12-13-16
|
First Notice | | 10/24/2016 | 11/14/2016 | | DONE |
|
|
|
Mailed 11-14-16
|
BLD-Final | 10/13/2016 | 10/14/2016 | 10/14/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
Permanent Occupancy | | | 10/14/2016 | | DONE |
|
|
|
|
BLD-Final | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | DEFR |
Phil Shearer
|
|
|
Hardware for panic bar is being installed early afternoon Phone #: ###-#### Inspection requested via web by kevin debelloy. Out of time
|
FIRE-Final Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
Jim Page
|
|
|
Previously noted item in regards to the northwest door hardware has been repaired, final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 10/10/2016 | 10/11/2016 | 10/11/2016 | P | PART |
Jim Page
|
|
|
Partial final inspection for area of work complete, the west side exterior doors both have double keyed deadbolts installed, one door is allowed the double keyed deadbolt. After discussing issue with superintendent the north door is going to have single action or panic door hardware installed. Final fire sprinkler inspection is complete, final fire alarm inspection is complete, final commercial hood fire suppression system inspection is complete, class K extinguisher has a current inspection tag and will be mounted in discussed location, ABC extinguisher is mounted in a common area with a current inspection tag. Life fire safety can be signed as passed/complete after door hardware is replaced on northwest exterior exit door and verfied for proper installation/operation.
|
BLD-Ceiling Grid Inspection | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 9/23/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/23/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2016 | | DONE |
Christina Prado
|
|
|
ALL REQUIREMENTS MET FOR PLAN MOD
DO NOT RE-ISSUE, MUST PAY ALL FEES PRIOR TO CHANGING STATUS TO ISS
|
Plan assigned to (CJW) | 8/26/2016 | 8/26/2016 | 8/29/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 8/26/2016 | | 8/29/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 8/29/2016 | | 8/29/2016 | | PASS |
Troy James
|
|
|
redlined the plans
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/26/2016 | | DONE |
Christina Prado
|
|
|
Plan mod requested per Adianne with Erstad Architects
|
Plan Modification Accepted | | | 8/26/2016 | | DONE |
|
|
|
Work flow received
|
BLD-Framing/Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | NR |
Dave Hannah
|
|
|
I would like to be on site for inspection with a 30 min heads up Phone #: ###-#### Inspection requested via web by kevin debelloy needs elec rough in and fire caulking piping though floor
|
Issue PAID IN FULL permit | | | 6/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/6/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/16/2016 | 3/16/2016 | 4/11/2016 | | PASS |
Carl Westfall
|
|
|
(April 5 - 15 days) Level 3 TI - ePlanReview - City Center - Gyro Shack
|
Routing - PLAN CHECK | 3/16/2016 | | 4/11/2016 | | PASS |
Carl Westfall
|
|
|
|
1st review completed | | | 4/11/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/11/2016 | | DONE |
|
|
|
***all requirments met 6-6-16 /CEV
need GC & rev cert of val
|
Routing - FIRE | 3/16/2016 | 3/16/2016 | 3/28/2016 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing PW Environmental | 3/16/2016 | | 3/18/2016 | | PASS |
Rick Christenson
|
|
|
Connecting to Grease Waste Line
|
Routing - MECHANICAL | 3/16/2016 | | 3/17/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 3/16/2016 | | 3/16/2016 | | PASS |
Bill VanDegrift
|
|
|
per plan and ISPC.
|
Routing - Addressing | 3/16/2016 | | 3/16/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/16/2016 | | 3/16/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 3/16/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Dave Ferguson and plan review fees paid.
|
Pending Assignment by JCB | 3/16/2016 | | 3/16/2016 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 3/14/2016 | | FAIL |
David Ferguson
|
|
|
Plan sheet a2.21 is cropped so the top and bottom of the page as well as the title block has been cut off.
Also, kitchen appliance sheets are not stamped.
|
Intake Approval | | | 3/11/2016 | | FAIL |
David Ferguson
|
|
|
since this is a 1st time tenant going into a new building, the City considers this out of the scope of a "Minor TI".
|
Telephone call | | | 3/10/2016 | | DONE |
|
|
|
talked to Seth -he said to go ahead and post payment-they knew the check was found
|
Application received | | | 3/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2016 11:59AM
|