BLD-Final | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 12/1/2016 | 12/1/2016 | 12/2/2016 | P | CANC |
Jim Sly
|
|
|
Pat phone ###-####
|
Zoning Approval | 12/2/2016 | 12/2/2016 | 12/2/2016 | | PASS |
Josh Wilson
|
|
|
|
Permanent Occupancy | | | 12/2/2016 | | DONE |
|
|
|
|
BLD-Final | 11/29/2016 | 11/29/2016 | 12/1/2016 | P | NR |
Jim Sly
|
|
|
Pat-whole building Phone #: ###-####
|
FIRE-Final Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans and notes, provide signage at the riser room door, provide address on the street side of the building.
|
BLD-Energy code compliance | 9/20/2016 | 9/20/2016 | 9/21/2016 | P | PASS |
Jim Sly
|
|
|
Suite- 101, 102, 103; Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Jim Sly
|
|
|
101-102-103 Pat Phone #: ###-####
|
BLD-Energy code compliance | 9/14/2016 | 9/14/2016 | 9/14/2016 | P | PASS |
Jim Sly
|
|
|
104,105,106; Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | PART |
Jim Sly
|
|
|
Pat Phone #: ###-####// inspection for units 104, 105, and 106
|
BLD-Energy code compliance | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PART |
Jim Sly
|
|
|
units: 107 108 109; Pat Phone #: ###-####.......OK
|
BLD-Conference | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | CANC |
Jim Sly
|
|
|
Rob Phone #: ###-####
|
Plan Modification Accepted | | | 7/27/2016 | | DONE |
|
|
|
new manual j report submitted.
|
Routing - MECHANICAL | 7/27/2016 | | 7/27/2016 | | PASS |
Troy James
|
|
|
New manual j report. This report supersedes the mechanical engineer for equipment and duct sizing and duct plan.
|
BLD-Conference | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | DONE |
Jim Sly
|
|
|
8:45 am
|
BLD-Conference | 7/20/2016 | 7/21/2016 | 7/20/2016 | A | CANC |
Jim Sly
|
|
|
8:45
|
BLD-Conference | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | DONE |
Jim Sly
|
|
|
|
BLD-Conference | 7/20/2016 | 7/20/2016 | 7/20/2016 | A | CANC |
Jim Sly
|
|
|
|
BLD-Foundation | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 7/5/2016 | 7/6/2016 | 7/6/2016 | P | CANC |
Jim Sly
|
|
|
Dane Phone #: ###-#### Canceled By Contr.
|
Telephone call | | | 6/28/2016 | | DONE |
|
|
|
emailed Biltmore that the addresses have been changed from 11050 W Ustick Rd to 11064 W Ustick Rd
|
Place hold on job | 6/13/2016 | | 6/15/2016 | | DONE |
Kristal Soland
|
|
|
DON NOT ISSUE WITHOUT BLD16-00733 & BLD16-00732
|
Print Occupancy Form | | | 6/15/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/15/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/13/2016 | | |
|
|
|
|
Plan assigned to (TLW) | 3/16/2016 | | 6/13/2016 | | PASS |
Tim L. Woodard
|
|
|
1st review complete
|
Routing PW Street Lights | 6/2/2016 | | 6/13/2016 | | PASS |
Tom Marshall
|
|
|
Approved in E-Plan Review. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2016 | | DONE |
|
|
|
NEED GC form and ACHD (no cert of value needed-GC is the applicant)
|
Routing - PLANNING Land Div | 6/2/2016 | | 6/8/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - MECHANICAL | 6/2/2016 | | 6/3/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 6/2/2016 | | 6/2/2016 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 6/2/2016 | | DONE |
|
|
|
|
Routing PW Street Lights | 5/5/2016 | | 5/23/2016 | | FAIL |
Tom Marshall
|
|
|
|
Routing - PLAN CHECK | 5/5/2016 | | 5/23/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 5/5/2016 | | 5/23/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 5/5/2016 | | 5/19/2016 | | PASS |
Brian Murphy
|
|
|
approved as sub by JT
|
Routing - MECHANICAL | 5/5/2016 | | 5/12/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 5/5/2016 | | 5/6/2016 | | FAIL |
Todd Tucker
|
|
|
Failed in E-Plan. TLW
|
Routing PW Solid Waste | 5/5/2016 | | 5/6/2016 | | PASS |
Megan Durrell
|
|
|
|
Plan resubmittals received | | | 5/5/2016 | | |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Design | 5/5/2016 | | 5/5/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connecting to existing stub.
|
Route to Impact Fee Review | 4/14/2016 | 4/17/2016 | 4/18/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Drainage | 3/16/2016 | | 4/14/2016 | | FAIL |
Brian Murphy
|
|
|
Failed in E-Plan Review
|
1st review completed | | | 4/14/2016 | | DONE |
|
|
|
|
Routing - PLANNING | 3/16/2016 | | 4/14/2016 | | FAIL |
Todd Tucker
|
|
|
PUD14-00007
|
Routing - PLAN CHECK | 3/16/2016 | | 4/14/2016 | | FAIL |
Tim L. Woodard
|
|
|
Refer to changemarks on E-Plan Review.TLW
|
Routing - MECHANICAL | 3/16/2016 | | 4/14/2016 | | FAIL |
Troy James
|
|
|
Failed in E-Plan Review. TLW
|
Routing Off Site - STRUCTURAL | 3/16/2016 | | 4/14/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Design | 3/16/2016 | | 3/28/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Include Civil Plans, show connection to public sewer.
|
Routing - Design Review | 3/16/2016 | | 3/23/2016 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00190
|
Routing PW Solid Waste | 3/16/2016 | | 3/22/2016 | | FAIL |
Megan Durrell
|
|
|
Site drawing and details for trash enclosure do not match. Must provide a consistent illustration of the trash enclosure to pass.
|
Routing - FIRE | 3/16/2016 | 3/16/2016 | 3/18/2016 | | PASS |
Scott Arellano
|
|
|
Attached comments to case.
|
Pending Assignment by TLW | 3/16/2016 | | 3/16/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 3/16/2016 | | 3/16/2016 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Street Lights | 3/16/2016 | | 3/16/2016 | | FAIL |
Mike D Hedge
|
|
|
Street light information missing from drawings.
|
Routing - Addressing | 3/16/2016 | | 3/16/2016 | | PASS |
Laura Hunter
|
|
|
Added 9 addresses
|
Routing - PUBLIC WORKS | 3/16/2016 | | 3/16/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/16/2016 | | 3/16/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to earth Disturbance)
Building #1 - West 9-Plex Townhome: One 4-plex building and two 9-plex townhome style buildings. GRD15-00021 ready to issue and ESC permits already created. A total of 22 units, the 2 downstairs units in the 4-plex will be ADA type A units. All 22 units will be 2 bedroom, 2 bathroom units and the 18 townhome style units will have the kitchen, living room and a powder bathroom downstairs with 2 bedrooms and 2 bathrooms upstairs. The project is located approximately 1,200 feet west of Five Mile Road on the north side of Ustick.
|
Intake Approval | | | 3/11/2016 | | PASS |
|
|
|
|
Application received | | | 3/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2016 1:29PM
|
First Notice | | 12/12/2016 | | | |
|
|
|
|