BLD-Final | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | NR |
Mike Jordan
|
|
|
Verizon Wireless Cellphone Site, Gate combo is 2914 Phone #: ###-#### Inspection requested via web by Nathan Bly. Fire /life/safety final has failed. needs fire/life safety fist.
|
BLD-Aging Inspection | 5/26/2017 | 5/26/2017 | 5/26/2017 | | NR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 5/25/2017 | 5/25/2017 | 5/26/2017 | | NR |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | FAIL |
Troy Cobbley
|
|
|
No inspection performed. I tried calling the contact number but it is the wrong number and is to a window washing company. I went to the project site and the only person I could speak to was an employee of the chiropractic clinic that occupies the same site.
Nathan Phone #: ###-####
|
BLD-Final | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | NR |
Jim Storey
|
|
|
Nathan Phone #: ###-#### fire achd
|
BLD-Foundation | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Tim Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/13/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/13/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/9/2016 | | |
|
|
|
|
Plan assigned to (TLW) | 4/12/2016 | | 6/9/2016 | | PASS |
Tim L. Woodard
|
|
|
5-12-16
|
Routing Off Site - STRUCTURAL | 5/19/2016 | | 6/9/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/9/2016 | | DONE |
|
|
|
need RP, GC & rev cert of val
|
Plan resubmittals received | | | 5/19/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/19/2016 | | 5/19/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS GRADING | 5/19/2016 | | 5/19/2016 | | PASS |
Brian Murphy
|
|
|
LEES THAN 1000 NEW PAVING
|
1st review completed | | | 5/18/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/12/2016 | | 5/17/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 4/12/2016 | | 5/13/2016 | | PASS |
Brent Moore
|
|
|
Approved in E-Plan Review. TLW
|
Routing - PLANNING Land Div | 4/12/2016 | | 5/13/2016 | | PASS |
Todd Tucker
|
|
|
Approved in E plan review. TLW
|
Routing Off Site - STRUCTURAL | 4/12/2016 | | 5/13/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 4/12/2016 | 4/12/2016 | 4/12/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for FD Access and water/hydrant availability. No comments required.
|
Routing PW Drainage | 4/12/2016 | | 4/12/2016 | | FAIL |
Brian Murphy
|
|
|
NEEDS DRAINAGE PLAN.
|
Routing - Addressing | 4/12/2016 | | 4/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/12/2016 | | 4/12/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/12/2016 | | 4/12/2016 | | PASS |
Evan Jenkins
|
|
|
(VERIZON WIRELESS - New Communication Pole) Install a 45' can pole within a 40' x 50' lease area with an 8' x 16' steel platform and a 6' x 9'-6" concrete pad for a generator.
|
Intake Approval | | | 4/12/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 4/12/2016 | | 4/12/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 4/8/2016 | | FAIL |
David Ferguson
|
|
|
"Naming Convention" requirements for a commercial submittal have not been followed.
|
Intake Approval | | | 3/10/2016 | | FAIL |
David Ferguson
|
|
|
The scope of work actually falls under new construction and therefore the #502 Checklist is required to be submitted along with all of the additional documents listed on that checklist
|
Application received | | | 3/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2016 4:10PM
|