Telephone call | | | 4/26/2017 | | DONE |
|
|
|
customer called-expressing a check for final fees due-should have it by May 1, 2017
|
Print Statement | | | 4/20/2017 | | DONE |
|
|
|
|
Print Statement | | | 1/20/2017 | | DONE |
|
|
|
|
Print Statement | | | 1/20/2017 | | DONE |
|
|
|
|
First Notice | | 12/22/2016 | 1/10/2017 | | DONE |
|
|
|
sent in mail 1-11-2017
|
BLD-Final | 12/12/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Jim Sly
|
|
|
Jam Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 12/12/2016 | | DONE |
|
|
|
|
BLD-Final | 12/6/2016 | 12/6/2016 | 12/8/2016 | P | PART |
Jim Sly
|
|
|
Beniton Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when.....2 separate exit doors at North side of Bldg have double keyed locks with indicators installed.
|
FIRE-Supply Line Hydro | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | PART |
Troy Cobbley
|
|
|
A fire watch is to be inplace as per Fire Dept and the contractor discussion for tonight. I'm scheduled for a final re-inspection for tomorrow morning for the testing of the two duct smoke detectors. Jim Sly is going to cover the main exit door hardware. I need to verify with the Fire Dept that all items for their tank inspection have be addressed. All other items appear ok.
|
PubWorks Occupancy Approval | 12/7/2016 | 12/7/2016 | 12/7/2016 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 12/7/2016 | 12/7/2016 | 12/7/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 12/6/2016 | 12/6/2016 | 12/6/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Ceiling Grid Inspection | 11/18/2016 | 11/21/2016 | 11/21/2016 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jan Tietjen
|
BLD-Energy code compliance | 10/20/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Jim Sly
|
|
|
Jam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/19/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jan Tietjen
|
BLD-Energy code compliance | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PART |
Jim Sly
|
|
|
Jan Phone #: ###-#### Walls behind coolers ......OK.
|
BLD-Wall Bracing | 9/30/2016 | 10/3/2016 | 10/3/2016 | P | PASS |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
BLD-Conference | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | DONE |
Jim Sly
|
|
|
Jam Phone #: ###-#### Walk Thru with Jan........Strata hired to do all special inspections.Exterior walls and roof framing almost complete.....went over wall bracing.
|
BLD-Foundation | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Jim Storey
|
|
|
Janan Phone #: ###-#### placed w si
|
BLD-Foundation | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PEND |
Jim Sly
|
|
|
Late morning .......Rebar // Jay Phone #: ###-#### Inspection of Footings for entire building. STRATA will be doing all special inspections. OK to pour with approval from STRATA and Stamped Approved plans are on site. No approved planson site at this time.
|
BLD-Footing | 8/12/2016 | 8/15/2016 | 8/15/2016 | A | PASS |
Mike Jordan
|
|
|
Jan-rebar-pour time 2:30 Phone #: ###-####. column footings for canopy. Will have special inspection.
|
Issue PAID IN FULL permit | | | 7/29/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/29/2016 | | |
|
|
|
|
OVERRIDE | | | 7/8/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 4/6/2016 | 4/6/2016 | 7/8/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed New Maverik and Fuel Island
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/8/2016 | | DONE |
|
|
|
still needs; ACHD approval 7-11-16 /CEV
Still needs; ACHD approval, GC Form, Revised Cert of Value 7-8-16 /CEV
Needs; ACHD approval, RP, GC Form, Revised Cert of Value
|
Routing PW Drainage | 6/30/2016 | | 7/7/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 7/6/2016 | | 7/6/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
reviewed last 2 items
|
Routing PW Drainage | 5/20/2016 | | 6/15/2016 | | FAIL |
|
|
|
need o and agreement
|
Routing PW Sewer Design | 5/20/2016 | | 5/31/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing Off Site - STRUCTURAL | 5/20/2016 | | 5/31/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 5/20/2016 | | 5/23/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 5/23/2016 | | 5/23/2016 | | PASS |
Daryl Spivey
|
|
|
Provide 4 inch drain for 2 1/2 inch RPBP to drain to.
|
Routing - Design Review | 5/20/2016 | | 5/20/2016 | | PASS |
Josh Wilson
|
|
|
|
Route to Impact Fee Review | 5/5/2016 | 5/8/2016 | 5/5/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 5/5/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/6/2016 | | 5/5/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING Land Div | 4/6/2016 | | 5/4/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Environmental | 4/6/2016 | | 5/4/2016 | | PASS |
Rick Christenson
|
|
|
Exterior Grease Interceptor 1500 gallon shown.
|
Routing Off Site - STRUCTURAL | 4/6/2016 | | 4/18/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 4/6/2016 | | 4/18/2016 | | FAIL |
Brian Murphy
|
|
|
NEEDS HYDRO CARBON TREATMENT ANA OM AGREEMENT
|
Routing - Design Review | 4/6/2016 | | 4/13/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 4/6/2016 | 4/6/2016 | 4/11/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Solid Waste | 4/6/2016 | | 4/11/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - MECHANICAL | 4/6/2016 | | 4/11/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/6/2016 | | 4/8/2016 | | PASS |
Daryl Spivey
|
|
|
1) additional cross connection protection may be required
2) asse 1070 mixing valves required at the lavs
3) floor sinks need to be 1/2 exposed at the cabinets
|
Routing PW Sewer Design | 4/6/2016 | | 4/7/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Install 48" sewer manhole labeled "401Y10" and connect 6" sewer service matching crown of pipe to crown of 8" sewer main. Show manhole angle between inverts. 6" service line within Boise Sewer Easement required to be 2% slope minimum.
Add note: Contact Boise Public Works 48 Hours prior to sewer connection to obtain tap permit and schedule inspection.
|
Routing PW Sewer Rating | 4/6/2016 | | 4/7/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 4/6/2016 | | 4/6/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/6/2016 | | 4/6/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 4/6/2016 | | 4/6/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(MAVERIK - Store #240) Permit to construct a new 5,518 square foot gas station and fuel canopy. 16049 Maverik Boise 240 Gas Station and Fuel Pumps
|
Pending Assignment by TLW | 4/6/2016 | | 4/6/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 4/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 3/30/2016 | | FAIL |
|
|
|
3-20-16
Please provide interior and exterior lighting compliance reports.
Please provide a mechanical compliance report.
The compliance report should also indicate the additional energy efficiency package if completed using Com-Check
All reports are required to use the same standard Ashrae 90.1 or Com-Check.
|
Intake Approval | | | 3/14/2016 | | FAIL |
|
|
|
Upload the form 502 checlist with all required items
|
Application received | | | 3/10/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 10 2016 2:13PM
|