BLD-Final | 11/22/2016 | 11/23/2016 | 11/23/2016 | A | PASS |
Mike Jordan
|
|
|
Chad Phone #: ###-####
|
DOC - Permit Finaled | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 6/22/2016 | 6/22/2016 | 6/22/2016 | P | PASS |
Mike Jordan
|
|
|
Shon-husband Of Helen can call in inspections-would like inspection after 2:00 if possible Phone #: ###-####
|
BLD-Framing/Rough-in | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PASS |
Jim Sly
|
|
|
Shon Phone #: ###-#### Frame and Shear........OK.
|
BLD-Footing | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-####
|
PubWorks Subgrade Approval | 4/19/2016 | 4/19/2016 | 4/19/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 3/24/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 3/23/2016 | 3/23/2016 | 3/24/2016 | | DONE |
David Ferguson
|
|
|
due 3/30 - Plans don't match the engineering
|
Routing - PLAN CHECK | 3/23/2016 | | 3/24/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2016 | | DONE |
|
|
|
|
Telephone call | | | 3/24/2016 | | DONE |
|
|
|
Spoke with Shon and informed him that his permit is ready and the fee amount that is due
|
Issue PAID IN FULL permit | | | 3/24/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/24/2016 | | DONE |
|
|
|
received two sets of structural calcs- put with plans on Dave's desk
|
Case Summary (BLD) | | | 3/24/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
|
|
|
All Met
|
Routing - Erosion and Sediment | 3/23/2016 | | 3/23/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep inspection and approval required prior to earth disturbance)
Hillside Home***Scope of work is to add 576 sq. ft. 2-story addition to existing home with covered patio.
|
Plan resubmittals received | | | 3/23/2016 | | DONE |
|
|
|
received 2 copies of ESC plans- put with plans on ESC table
|
Routing Walk-In (BLD) | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | FAIL |
David Ferguson
|
|
|
Level 2 walk-in and needs to be routed to Evan Jenkins for ESC approval.
|
Routing Walk-In (PW Hillside) | 3/11/2016 | 3/11/2016 | 3/11/2016 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | FAIL |
Tisha Gallop
|
|
|
need hillside review, esc plans/waiver, foundation engineering and possible engineering for shear, additional beams/headers not on plan.
|
1st review completed | | | 3/10/2016 | | DONE |
|
|
|
|
Application received | | 3/10/2016 | | | |
|
|
|
|