BLD-Final | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by David Towner
|
DOC - Permit Finaled | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD - Request for Extension | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PASS |
Brandon Shaw
|
|
|
David Phone #: ###-####
|
BLD-Aging Inspection | 11/22/2017 | 11/22/2017 | 11/24/2017 | | DONE |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 11/21/2017 | 11/21/2017 | 11/21/2017 | | DONE |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Conference | 10/15/2017 | 10/16/2017 | 10/16/2017 | A | DONE |
Brandon Shaw
|
|
|
Request conference to discuss flashing at juncture of new roof and existing house wall. Phone #: ###-#### Inspection requested via web by David Towner
|
BLD-Framing/Rough-in | 7/7/2017 | 7/7/2017 | 7/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by David Towner
|
BLD-Conference | 7/2/2017 | 7/3/2017 | 7/3/2017 | A | DONE |
Brandon Shaw
|
|
|
Request preliminary wall framing inspection and consultation before sheathing. Phone #: ###-#### Inspection requested via web by David Towner
|
Extend Review Timeline | | | 2/24/2017 | | DONE |
|
|
|
1st approved 180 day extension per Jason B. See documents
|
Change Expiration Date Only | | | 2/23/2017 | | DONE |
Jason Blais
|
|
|
First extension approved for an issued permit.
|
BLD-Other | 6/5/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Phil Shearer
|
|
|
Request foundation wall forming and rebar inspection. Phone #: ###-#### Inspection requested via web by David Towner
|
BLD-Conference | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PEND |
Phil Shearer
|
|
|
Preliminary rebar inspection requested. I would like to verify that the rebar work is acceptable before forming the foundation walls. Mid to late morning is preferred. Thanks. Phone #: ###-#### Inspection requested via web by David Towner
|
BLD-Other | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Phil Shearer
|
|
|
Footing and Foundation Inspection requested. Mid to late morning preferred. Phone #: ###-#### Inspection requested via web by David Towner
|
BLD-Conference | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | DONE |
Phil Shearer
|
|
|
I''d like to discuss routing domestic water supply line through footing. Phone #: ###-#### Inspection requested via web by David Towner
|
BLD-Other | 3/11/2016 | 3/15/2016 | 3/15/2016 | P | CANC |
Phil Shearer
|
|
|
Andy did the site prep 3-11 // Erosion Inspection ESC16-00329
Phone #: ###-#### >> Inspection requested via web by David Towner
|
OVERRIDE | | | 3/11/2016 | | |
|
|
|
|
Routing Walk-In (PW Hillside) | 3/11/2016 | 3/11/2016 | 3/11/2016 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 3/11/2016 | 3/11/2016 | 3/11/2016 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/11/2016 | 3/11/2016 | 3/11/2016 | A | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 3/11/2016 | 3/11/2016 | 3/11/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/11/2016 | | 3/11/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 3/11/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/11/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/11/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 3/11/2016 | | DONE |
|
|
|
|
1st review completed | | | 3/11/2016 | | DONE |
David Ferguson
|
|
|
|
PubWorks Subgrade Approval | 4/5/2016 | 4/5/2016 | | | |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Application received | | 3/11/2016 | | | |
|
|
|
|