BLD-Final | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Tony Young
|
|
|
Zack Phone #: ###-####
|
DOC - Permit Finaled | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 8/10/2016 | 8/11/2016 | 8/11/2016 | P | NR |
Tony Young
|
|
|
Zack Phone #: ###-####,, need steps out door,, trades,, walk through only
|
BLD-Energy code compliance | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####-would like before 3 if possible and would like a 30 minute call prior
|
BLD-Other | 5/4/2016 | 5/4/2016 | 5/4/2016 | A | DONE |
Tony Young
|
|
|
Ok to insulate. All trades approved for cover.
|
BLD-Wall Bracing | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PART |
Tony Young
|
|
|
Zack--please call 30 minutes prior to meet Phone #: ###-####,, exterior ok
|
BLD-Framing/Rough-in | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | NR |
Tony Young
|
|
|
Zack--please call 30 minutes prior to meet Phone #: ###-####,, conf only
|
BLD-Foundation | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PART |
Tony Young
|
|
|
Zack Phone #: ###-####,, work in progress
|
BLD-Footing | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | PASS |
Tony Young
|
|
|
Zack Phone #: ###-####
|
OVERRIDE | | | 3/28/2016 | | |
|
|
|
|
Routing Walk-In (Erosion) | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Evan Jenkins
|
|
|
New Garage to Existing Hillside SFH
|
Routing Walk-In (BLD) | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/28/2016 | | 3/28/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/28/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/28/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/28/2016 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
PubWorks Subgrade Approval | 3/25/2016 | 3/25/2016 | 3/25/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (BLD) | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | FAIL |
David Ferguson
|
|
|
Need engineering for foundation, Manual J and ERC approvals. Needs to be routed to Troy, and Evan
|
Routing Walk-In (Zoning) | 3/14/2016 | 3/14/2016 | 3/14/2016 | A | DONE |
Brent Moore
|
|
|
Fairled does not meet 10 side setback
|
Routing Walk-In (Zoning) | 3/14/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Colleen T Carroll
|
|
|
Applicant verified setback of 10 feet
|
Routing Walk-In (BLD) | 3/14/2016 | 3/14/2016 | 3/14/2016 | A | FAIL |
Brian McGowan
|
|
|
Needed engineering for foundation plan
|
1st review completed | | | 3/14/2016 | | FAIL |
Brian McGowan
|
|
|
No engineering provided for foundation.
|
Routing - PLAN CHECK | 3/14/2016 | | 3/14/2016 | | FAIL |
Brian McGowan
|
|
|
Foundation must be engineered, stamped and signed.
|
Application received | | 3/14/2016 | | | |
|
|
|
|