BLD-Final | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | FAIL |
Jim Sly
|
|
|
Thomas Phone #: ###-####/// please call before Need Egress window and Smoke/CO2 combo outside sleeping room.
|
BLD-Framing/Rough-in | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Phil Shearer
|
|
|
Call 20mins before // Thomas Phone #: ###-####
|
Routing Walk-In (BLD) | 5/5/2016 | 5/5/2016 | 5/5/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 5/5/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/5/2016 | | 5/5/2016 | | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/5/2016 | | DONE |
|
|
|
plal mod fees due
|
(F) Reprint permit | | | 5/5/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/5/2016 | | DONE |
|
|
|
plan mod fees paid
|
Plan Modification Accepted | | | 5/5/2016 | | DONE |
|
|
|
modifications to bedroom layout
|
BLD-Framing/Rough-in | 5/2/2016 | 5/3/2016 | 5/3/2016 | P | CANC |
Phil Shearer
|
|
|
Thomas// please call 20 min. prior Phone #: ###-####
|
Routing Walk-In (BLD) | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 3/14/2016 | 3/14/2016 | 3/14/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/14/2016 | | 3/14/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/14/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/14/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/14/2016 | | DONE |
|
|
|
|
1st review completed | | | 3/14/2016 | | DONE |
David Ferguson
|
|
|
|
Application received | | 3/14/2016 | | | |
|
|
|
|