Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD16-00811
StatusFinaled
Name ESPLIN BRETT EUGENE
Site Address 2840 N HEATHER PL
Project Name 
Customer Number 
ePlanReviewNo
Description
Remove existing non bearing walls on main floor between the two bedrooms. Modifiy into a Master Bedroom, add Master Bath and Master closet to same area. (3) existing windows to be filled in, (3) new windows to be added. All work, except adding or filling in windows, is on the interior of the home. All work to be done according to plans, review notes and local codes. Separate electrical, plumbing and mechanical permits are required. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in11/27/201912/3/201912/3/2019ADONE
DetailsTony Young
Brett Phone #: ###-####,, done prior
DOC - Permit Finaled12/3/201912/3/201912/3/2019PPASS
DetailsTony Young
BLD-Final12/3/201912/3/201912/3/2019PPASS
DetailsTony Young
Brett Phone #: ###-####
BLD-Energy code compliance5/6/20165/6/20165/6/2016PPASS
DetailsTony Young
Andrea Phone #: ###-####,, work in progress
BLD-Energy code compliance5/5/20165/6/20165/6/2016ANR
DetailsTony Young
Andrea Phone #: ###-####
BLD-Framing/Rough-in5/5/20165/5/20165/5/2016PPASS
DetailsTony Young
Andrea Phone #: ###-####
BLD-Wall Bracing4/14/20164/15/20164/15/2016ACANC
DetailsTony Young
Andrea Phone #: ###-####
BLD-Framing/Rough-in4/11/20164/14/20164/14/2016ANR
DetailsTony Young
Andrea Phone #: ###-####,, need trades 1st
Issue PAID IN FULL permit  3/25/2016 DONE
Plan assigned to (BJM)3/15/20163/15/20163/16/2016 DONE
DetailsBrian McGowan
Routing Walk-In (BLD)3/14/20163/14/20163/16/2016PDONE
DetailsBrian McGowan
Could not get to plans before 5. They dropped off prints for me to review by Thursday.
Routing - PLAN CHECK3/15/2016 3/16/2016 PASS
DetailsBrian McGowan
1st review completed  3/16/2016 DONE
DetailsBrian McGowan
Case Summary (BLD)  3/16/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  3/16/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/16/2016 DONE
Permit Ready to Issue  3/16/2016 DONE
**MET** Owner needs to sign GC Form
Telephone call  3/16/2016 DONE
Left a message for Brett that the permit is ready to be picked up and the fee amount that is due
Application received 3/14/2016