Permit Information
Permit NumberBLD16-00818
StatusIssued
Name GLOBAK ALEKSANDR
Site Address 220 S COTTERELL DR
Project Name 
Customer Number 
ePlanReviewNo
Description
The scope of work is to construct a 2038 sq. ft. 2-story home with a 500 sq. ft. garage attached onto the rear of the existing residence. Planning will require that the kitchen in the existing residence be removed with only one kitchen located in the new addition. The home will also have a 186 sq. ft. covered front porch with a 128 sq. ft. deck located at the rear of the addition. Electrical, plumbing and HVAC permits will be pulled separately. Work will be performed per the approved plans, engineered detail sections and local codes. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Concrete6/2/20206/3/20206/3/2020APASS
DetailsMike Jordan
Alex Phone #: ###-####. Framing for exterior concrete stairs.
BLD-Aging Inspection4/23/20204/23/20204/23/2020 CANC
DetailsMike Jordan
BLD-Aging Inspection4/22/20204/22/20204/23/2020 PASS
DetailsMike Jordan
Case Summary (BLD)  1/10/2020 DONE
(F) Reprint permit  12/11/2019 DONE
BLD-Conference12/10/201912/10/201912/10/2019PDONE
DetailsMike Jordan
ALEX Phone #: ###-####
BLD-Framing/Rough-in12/10/201912/10/201912/10/2019PPASS
DetailsMike Jordan
ALEX Phone #: ###-####. Interior wood framed walls for furnace enclosure.
BLD-Framing/Rough-in12/10/201912/10/201912/10/2019PCANC
DetailsMike Jordan
ALEX Phone #: ###-####
Case Summary (BLD)  12/10/2019 DONE
BLD-Wall cover6/13/20196/14/20196/14/2019APASS
DetailsMike Jordan
Alexander Phone #: ###-####
Case Summary (BLD)  2/1/2019 DONE
BLD-Energy code compliance12/20/201812/21/201812/21/2018APASS
DetailsMike Jordan
Alex Phone #: ###-####
BLD-Framing/Rough-in10/22/201810/22/201810/22/2018PPASS
DetailsMike Jordan
Alex Phone #: ###-####. Ok to insulate.
BLD-Framing/Rough-in10/17/201810/18/201810/18/2018APART
DetailsMike Jordan
Aleksandr Phone #: ###-####. Framing ok. Needs to complete air seal and fireblock above stairs.
Inspection Record Card- Bld  7/18/2018 DONE
Plan Modification Accepted  7/13/2018 DONE
new manual j report
Routing - MECHANICAL7/13/2018 7/13/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing6/21/20186/22/20186/22/2018ACANC
DetailsMike Jordan
shear // Aleksandr Phone #: ###-####
BLD-Framing/Rough-in6/11/20186/12/20186/12/2018ANR
DetailsMike Jordan
Requests 11AM, late morning - Alek Phone #: ###-####
BLD-Wall Bracing6/11/20186/12/20186/12/2018APASS
DetailsMike Jordan
Requests 11AM, late morning - Alek Phone #: ###-####
BLD-Conference5/15/20185/16/20185/16/2018ADONE
DetailsMike Jordan
Alex Phone #: ###-####. Went over plans and shear walls.
Case Summary (BLD)  3/8/2018 DONE
BLD-Concrete3/5/20183/6/20183/6/2018APASS
DetailsMike Jordan
11am please- call when on way- Aleksandr Phone #: ###-####
BLD-Aging Inspection1/25/20181/25/20181/26/2018 PASS
DetailsMike Jordan
Case Summary (BLD)  11/20/2017 DONE
DetailsChristina Prado
Change Expiration Date Only  9/8/2017 DONE
DetailsJason Blais
First 180 day extension for an issued permit approved.
BLD - Request for Extension9/6/20179/7/20179/7/2017ADONE
DetailsMike Jordan
Alek Phone #: ###-####. Spoke to Alek, nneds and extension until April 2018. Footings and foundation completed. No framing has begun. Needs to provide letter to building official for extension approval.
Case Summary (BLD)  7/21/2017 DONE
BLD-Foundation3/16/20173/16/20173/16/2017PPASS
DetailsMike Jordan
Wall // Debat Phone #: ###-####
BLD-Footing3/13/20173/14/20173/14/2017APART
DetailsMike Jordan
Alex Phone #: ###-####
Inspection Record Card- Bld  3/25/2016 DONE
Permit Ready to Issue  3/25/2016 DONE
Telephone call  3/25/2016 DONE
called customer to let know permit is ready and how much permit fees are
Issue PAID IN FULL permit  3/25/2016 DONE
Plan assigned to (DAF)3/16/20163/16/20163/24/2016 DONE
DetailsDavid Ferguson
due 3/23 - failed - need engineering and applicant now wants to get the project value engineered as the plans were over built for this area.
Routing - PLAN CHECK3/24/2016 3/24/2016 PASS
DetailsDavid Ferguson
Case Summary (BLD)  3/24/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  3/24/2016 DONE
Routing - PLAN CHECK3/21/2016 3/23/2016 FAIL
DetailsDavid Ferguson
Routing - MECHANICAL3/16/2016 3/21/2016 PASS
DetailsTroy James
Routing Walk-In (Zoning)3/15/20163/15/20163/15/2016APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)3/15/20163/15/20163/15/2016AFAIL
DetailsDavid Ferguson
No Manual J provided - route to Dave F and Troy when customer returns with proper documents.
1st review completed  3/15/2016 FAIL
DetailsDavid Ferguson
Need engineering for new foundation attaching to existing basement wall, wall bracing plan and other structural details.
Application received 3/15/2016   
due 3/23