BLD-Concrete | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | PASS |
Mike Jordan
|
|
|
Alex Phone #: ###-####. Framing for exterior concrete stairs.
|
BLD-Aging Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 | | CANC |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 4/22/2020 | 4/22/2020 | 4/23/2020 | | PASS |
Mike Jordan
|
|
|
|
Case Summary (BLD) | | | 1/10/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/11/2019 | | DONE |
|
|
|
|
BLD-Conference | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | DONE |
Mike Jordan
|
|
|
ALEX Phone #: ###-####
|
BLD-Framing/Rough-in | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Mike Jordan
|
|
|
ALEX Phone #: ###-####. Interior wood framed walls for furnace enclosure.
|
BLD-Framing/Rough-in | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | CANC |
Mike Jordan
|
|
|
ALEX Phone #: ###-####
|
Case Summary (BLD) | | | 12/10/2019 | | DONE |
|
|
|
|
BLD-Wall cover | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Mike Jordan
|
|
|
Alexander Phone #: ###-####
|
Case Summary (BLD) | | | 2/1/2019 | | DONE |
|
|
|
|
BLD-Energy code compliance | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
Mike Jordan
|
|
|
Alex Phone #: ###-####
|
BLD-Framing/Rough-in | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Mike Jordan
|
|
|
Alex Phone #: ###-####. Ok to insulate.
|
BLD-Framing/Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PART |
Mike Jordan
|
|
|
Aleksandr Phone #: ###-####. Framing ok. Needs to complete air seal and fireblock above stairs.
|
Inspection Record Card- Bld | | | 7/18/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/13/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/13/2018 | | 7/13/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | CANC |
Mike Jordan
|
|
|
shear // Aleksandr Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | NR |
Mike Jordan
|
|
|
Requests 11AM, late morning - Alek Phone #: ###-####
|
BLD-Wall Bracing | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Mike Jordan
|
|
|
Requests 11AM, late morning - Alek Phone #: ###-####
|
BLD-Conference | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | DONE |
Mike Jordan
|
|
|
Alex Phone #: ###-####. Went over plans and shear walls.
|
Case Summary (BLD) | | | 3/8/2018 | | DONE |
|
|
|
|
BLD-Concrete | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PASS |
Mike Jordan
|
|
|
11am please- call when on way- Aleksandr Phone #: ###-####
|
BLD-Aging Inspection | 1/25/2018 | 1/25/2018 | 1/26/2018 | | PASS |
Mike Jordan
|
|
|
|
Case Summary (BLD) | | | 11/20/2017 | | DONE |
Christina Prado
|
|
|
|
Change Expiration Date Only | | | 9/8/2017 | | DONE |
Jason Blais
|
|
|
First 180 day extension for an issued permit approved.
|
BLD - Request for Extension | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | DONE |
Mike Jordan
|
|
|
Alek Phone #: ###-####. Spoke to Alek, nneds and extension until April 2018. Footings and foundation completed. No framing has begun. Needs to provide letter to building official for extension approval.
|
Case Summary (BLD) | | | 7/21/2017 | | DONE |
|
|
|
|
BLD-Foundation | 3/16/2017 | 3/16/2017 | 3/16/2017 | P | PASS |
Mike Jordan
|
|
|
Wall // Debat Phone #: ###-####
|
BLD-Footing | 3/13/2017 | 3/14/2017 | 3/14/2017 | A | PART |
Mike Jordan
|
|
|
Alex Phone #: ###-####
|
Inspection Record Card- Bld | | | 3/25/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/25/2016 | | DONE |
|
|
|
|
Telephone call | | | 3/25/2016 | | DONE |
|
|
|
called customer to let know permit is ready and how much permit fees are
|
Issue PAID IN FULL permit | | | 3/25/2016 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 3/16/2016 | 3/16/2016 | 3/24/2016 | | DONE |
David Ferguson
|
|
|
due 3/23 - failed - need engineering and applicant now wants to get the project value engineered as the plans were over built for this area.
|
Routing - PLAN CHECK | 3/24/2016 | | 3/24/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/24/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/21/2016 | | 3/23/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - MECHANICAL | 3/16/2016 | | 3/21/2016 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (Zoning) | 3/15/2016 | 3/15/2016 | 3/15/2016 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/15/2016 | 3/15/2016 | 3/15/2016 | A | FAIL |
David Ferguson
|
|
|
No Manual J provided - route to Dave F and Troy when customer returns with proper documents.
|
1st review completed | | | 3/15/2016 | | FAIL |
David Ferguson
|
|
|
Need engineering for new foundation attaching to existing basement wall, wall bracing plan and other structural details.
|
Application received | | 3/15/2016 | | | |
|
|
|
due 3/23
|