BLD-Blower Door Test Results | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Tony Young
|
|
|
3.34
|
BLD-Final | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PASS |
Mike Jordan
|
|
|
Larry Phone #: ###-####
|
DOC - Permit Finaled | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Mike Jordan
|
|
|
|
PubWorks Occupancy Approval | 10/19/2016 | 10/19/2016 | 10/19/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Other | 8/12/2016 | 8/15/2016 | 8/15/2016 | A | PASS |
Tony Young
|
|
|
Brandon-soffit sheet rock Phone #: ###-####,, ok now
|
BLD-Other | 8/11/2016 | 8/12/2016 | 8/12/2016 | P | PEND |
Tony Young
|
|
|
Brandon-soffit sheet rock Phone #: ###-####,, still pending electrical pass on the soffits
|
BLD-Other | 8/10/2016 | 8/11/2016 | 8/11/2016 | A | PEND |
Tony Young
|
|
|
Brandon-soffit sheet rock Phone #: ###-####,, still need to verify electrical pass in soffits..
|
BLD-Other | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | PEND |
Tony Young
|
|
|
Brandon-soffit sheet rock Phone #: ###-####,, ok after electrical pass,, need to firecaulk around wires in fireboxes in soffit can lights
|
BLD-Energy code compliance | 7/28/2016 | 7/28/2016 | 7/28/2016 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | PART |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Repar bottom chord of A4 truss per the approved engineering. ok to insulte
|
BLD-Wall Bracing | 6/28/2016 | 6/29/2016 | 6/29/2016 | P | PART |
Tony Young
|
|
|
Larry Phone #: ###-####,, exterior shear ok
|
BLD-Wall Bracing | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PART |
Tony Young
|
|
|
Larry Phone #: ###-####,, work in progress
|
BLD-Foundation | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Phil Shearer
|
|
|
Pouring at 9:30 - Shawn Phone #: ###-####
|
BLD-Footing | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Footing | 5/10/2016 | 5/10/2016 | 5/10/2016 | A | CANC |
Mike Jordan
|
|
|
or shawn at ###-####; Phone #: ###-####
|
PubWorks Subgrade Approval | 5/10/2016 | 5/10/2016 | 5/10/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/28/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 4/27/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 4/14/2016 | 4/14/2016 | 4/27/2016 | | DONE |
David Ferguson
|
|
|
due 4/29 L2 hillside - Plan review complete 4/25/16 - Failed due to multiple issues
|
Routing - MECHANICAL | 4/26/2016 | | 4/27/2016 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/27/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PLAN CHECK | 4/26/2016 | | 4/26/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 4/8/2016 | | 4/25/2016 | | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 4/25/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - Erosion and Sediment | 4/22/2016 | | 4/22/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep inspection and approval required prior to earth disturbance)
WUI Zone A ** Permit for the construction of a new 3431 sq. ft., two story (first story 2409 sq. ft., second story 1022 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately *** sq. ft. of covered patio/porch and a 879 sq. ft. attached garage
|
Plan assigned to (LEG) Tisha | 4/8/2016 | | 4/14/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 4/8/2016 | | 4/11/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/8/2016 | | 4/11/2016 | | PASS |
Andrea Tuning
|
|
|
Approved with one redline in regard to the retaining wall being a maximum of 3-feet in height in the front setback.
|
Routing - Erosion and Sediment | 4/8/2016 | | 4/11/2016 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative is required for approval
|
Routing - FIRE | 4/8/2016 | 4/8/2016 | 4/8/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for fire department access and water/hydrant availability. No comments required.
|
Routing PW Grading-Hillside | 4/8/2016 | | 4/8/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 4/8/2016 | | 4/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/8/2016 | | 4/8/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/8/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/8/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/8/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 15 2016 11:37AM
|