BLD-Final | 6/12/2017 | 6/14/2017 | 6/14/2017 | A | PASS |
Jim Sly
|
|
|
Call half before // Vivian Phone #: ###-####
|
BLD-Framing/Rough-in | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Jim Sly
|
|
|
Jack--Vivians boyfirend Phone #: ###-####
|
BLD-Wall Bracing | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PART |
Jim Sly
|
|
|
Wayne Phone #: ###-#### Concrete foundation wall......OK
|
BLD-Footing | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Jim Sly
|
|
|
Lane Phone #: ###-####
|
OVERRIDE | | | 3/15/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 3/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/15/2016 | | 3/15/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/15/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/15/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/15/2016 | | DONE |
|
|
|
|
Application received | | 3/15/2016 | | | |
|
|
|
|