Second Notice | | 5/22/2016 | 6/10/2016 | | DONE |
|
|
|
|
First Notice | 4/22/2016 | 4/22/2016 | 5/12/2016 | | DONE |
Mike Jordan
|
|
|
Mailed 5-13-16
|
BLD-Final | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | PASS |
Mike Jordan
|
|
|
Final Racking Building Inspection Request for Today 04.22.16 Point of Contact Rich Murdoch 208.861.7608 or Jane Chism 214.989.7841 Inspection requested via web by Jane Chism. Provide 3rd. party inspection for post installed anchors. Phone #: ###-#### Inspection requested via web by Jane Chism
|
DOC - Permit Finaled | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | FAIL |
Mike Jordan
|
|
|
Final Racking Building Inspection Request for Today 04.15.16 Point of Contact Rich Murdoch 208.861.7608 or Jane Chism 214.989.7841 2:30PM preferred if possible Phone #: ###-#### Inspection requested via web by Jane Chism. Provide 3rd. party inspection for post installed anchors.
|
FIRE-Final Inspection | 4/13/2016 | 4/13/2016 | 4/13/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. I spoke with the store manager about maximum storage heights and not to block the corridor with boxes.
|
FIRE-Final Inspection | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | FAIL |
Troy Cobbley
|
|
|
Not all of the city approved documents appeared to be here. Missing the floor plans and notes. Max storage height on the scope of work says 10'. Actual storage height has been exceeded in the store. No actual inspection could be performed.
|
Issue PAID IN FULL permit | | | 4/4/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/4/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 3/23/2016 | 3/23/2016 | 4/1/2016 | | PASS |
Javier Guzman
|
|
|
4/05 L2 TORRID - Racking Permit ePlan
|
Routing - PLAN CHECK | 3/23/2016 | | 4/1/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 4/1/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/1/2016 | | DONE |
Christina Prado
|
|
|
4-4-16 ALL REQUIRMENTS MET /CEV
Need GC Form & Revised certifcate of value for issuance
|
Routing - FIRE | 3/23/2016 | 3/23/2016 | 3/28/2016 | | PASS |
Katie Marron
|
|
|
No comments attached.
|
Intake Approval | | | 3/23/2016 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/17/2016 | | DONE |
|
|
|
Emailed failed prescreen racking review
|
Application received | | | 3/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2016 9:09AM
|