BLD-Final | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
DOC - Permit Finaled | 12/14/2016 | 12/14/2016 | 12/14/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Final | 12/9/2016 | 12/12/2016 | 12/12/2016 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO/// ok pending tempered glass
|
BLD-Aging Inspection | 12/2/2016 | 12/2/2016 | 12/2/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Other | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | PASS |
Phil Shearer
|
|
|
Soffit - Justin Phone #: ###-####
|
BLD-Energy code compliance | 7/20/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Phil Shearer
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PASS |
Jim Sly
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Jim Sly
|
|
|
Shear // Justin Phone #: ###-####
|
BLD-Wall Bracing | 7/12/2016 | 7/13/2016 | 7/13/2016 | P | NR |
Tony Young
|
|
|
Shear // Justin Phone #: ###-####,, needs nailed off better
|
BLD-Framing/Rough-in | 7/12/2016 | 7/13/2016 | 7/13/2016 | P | NR |
Tony Young
|
|
|
Justin Phone #: ###-####,, walk through only,, need trades
|
BLD-Foundation | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, 301 could not make it last week,, poured
|
BLD-Foundation | 5/13/2016 | 5/13/2016 | 5/13/2016 | P | DEFR |
Jim Storey
|
|
|
Bill Phone #: ###-#### out of time
|
BLD-Footing | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 5/2/2016 | 5/3/2016 | 5/3/2016 | P | CANC |
Dave Hannah
|
|
|
Bill ###-####
|
PubWorks Subgrade Approval | 4/26/2016 | 4/26/2016 | 4/26/2016 | | DONE |
Jason C. Taylor
|
|
|
**BASEMENT AND RESIDENTIAL FOOTINGS ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/22/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 4/6/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 3/23/2016 | 3/23/2016 | 4/6/2016 | | DONE |
David Ferguson
|
|
|
due 4/6 L2 hillside
|
Routing - PLAN CHECK | 3/28/2016 | | 4/6/2016 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 4/6/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 4/6/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2016 | | DONE |
|
|
|
all requirements met
|
Inspection Record Card- Bld | | | 4/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/6/2016 | | DONE |
|
|
|
called Justin to let know permit is already and how much is owed-left message on his cell
|
Routing - FIRE | 3/28/2016 | | 3/28/2016 | | PASS |
Scott Arellano
|
|
|
No separate comments attached. This property is subject to Fire Department inspection to verify sustained compliance with BMC 7-01-69 section 4920 specifying a 30 foot definsible space from the structure to the undeveloped land abutting this property.
|
Routing - Erosion and Sediment | 3/24/2016 | | 3/25/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 2,390 sq. ft., two story (main level 1,627 sq. ft., finished basement 763 sq. ft.) single family dwelling with 4 bedrooms, 2 and a half bathrooms, approximately ???? sq. ft. of covered patio/porch and a 600 sq. ft. attached garage
|
Routing - MECHANICAL | 3/23/2016 | | 3/24/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/21/2016 | | 3/23/2016 | | PASS |
Susan Riggs
|
|
|
Approved with conditons as indicated on site plan.SAR
|
Plan assigned to (LEG) Tisha | 3/16/2016 | | 3/23/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2016 | | 3/21/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 3/16/2016 | | 3/21/2016 | | PASS |
Jason C. Taylor
|
|
|
**SUBGRADE ONLY-NO FEES***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Addressing | 3/16/2016 | | 3/16/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/16/2016 | | DONE |
|
|
|
|
Intake Approval | | | 3/16/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/16/2016 | | DONE |
|
|
|
|
Application received | | 3/16/2016 | | | |
|
|
|
|