Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00849
StatusFinaled
Name SILVER CREEK HOMES
Site Address 3331 N CRANE CREEK RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Interior work only. Several windows to be replaced and or added. No exterior footings or walls. Remove wall between Kitchen and Dining room, remove wall between Dining and Living room, replace existing wood fireplace with gas fireplace. Remove walls back area, create new Master Bedroom and Bath area. Remove existing fireplace on rear of home. Remove existing door on side of home and fill. Replace windows as needed to be egress windows. All work to be done according to plans, review notes and local codes. Separate electrical, plumbing and mechanical permits are required. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval11/21/201611/21/201611/21/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final6/28/20166/29/20166/29/2016APASS
DetailsJim Sly
Monica Phone #: ###-####
DOC - Permit Finaled6/29/20166/29/20166/29/2016PPASS
DetailsJim Sly
BLD-Final6/23/20166/24/20166/24/2016PNH
DetailsJim Storey
Monica Phone #: ###-####
BLD-Energy code compliance4/7/20164/7/20164/7/2016PPASS
DetailsTony Young
Monica Phone #: ###-####
BLD-Framing/Rough-in4/5/20164/6/20164/6/2016PPASS
DetailsJim Sly
Monica Phone #: ###-####
Routing Walk-In (BLD)3/16/20163/16/20163/16/2016PDONE
DetailsBrian McGowan
1st review completed  3/16/2016 DONE
DetailsBrian McGowan
Routing - PLAN CHECK3/16/2016 3/16/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  3/16/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  3/16/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/16/2016 DONE
Permit Ready to Issue  3/16/2016 DONE
all requirments met
Issue PAID IN FULL permit  3/16/2016 DONE
Application received 3/16/2016