Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD16-00858
StatusFinaled
Name STETSON HOMES INC
Site Address 2373 S FIVE MILE RD
Project NameHollandale
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3014 sq. ft., one story single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 361 sq. ft. of covered patio/porch and a 1422 sq. ft. attached garage per the approved plans, and any notations. R-1A zoning and setbacks per planning. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/1/20169/2/20169/2/2016APASS
DetailsJim Storey
Tom Phone #: ###-#### c/n made ok
DOC - Permit Finaled9/2/20169/2/20169/2/2016PPASS
DetailsJim Storey
BLD-Final8/30/20168/31/20168/31/2016AFAIL
DetailsMike Jordan
Todd Phone #: ###-####. Provide tempered glazing in windows on either side of exterior door to patio in masterbedroom. A smoke detector and CO detector required in hall way outside of sleeping rooms. All detectors must be hardwired and interconnected. Provide the blower door test result and post or the 3rd. party airseal inspection report. A correction notice has been issued.
BLD-Energy code compliance6/30/20167/1/20167/1/2016ACANC
DetailsMike Jordan
Todd Phone #: ###-####
BLD-Wall Bracing7/1/20167/1/20167/1/2016APASS
DetailsMike Jordan
Todd Phone #: ###-####. Interior wall bracing ok.
BLD-Energy code compliance6/21/20166/23/20166/23/2016APASS
DetailsMike Jordan
Todd Phone #: ###-####
BLD-Wall Bracing6/21/20166/21/20166/21/2016APASS
DetailsDave Hannah
BLD-Framing/Rough-in6/20/20166/21/20166/21/2016APASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in6/16/20166/17/20166/17/2016ANR
DetailsMike Jordan
Todd Phone #: ###-####. Complete air seal pack prior to framing inspection. Correction notice posted.
BLD-Foundation5/23/20165/24/20165/24/2016ACANC
DetailsMike Jordan
Shear // Todd Phone #: ###-####
BLD-Wall Bracing5/24/20165/24/20165/24/2016APASS
DetailsMike Jordan
Shear // Todd Phone #: ###-####
BLD-Foundation4/15/20164/18/20164/18/2016APASS
DetailsMike Jordan
Santos Phone #: ###-####
BLD-Footing4/12/20164/13/20164/13/2016PPASS
DetailsMike Jordan
Santos Phone #: ###-####
Issue PAID IN FULL permit  4/12/2016 DONE
Inspection Record Card- Bld  4/12/2016 DONE
OVERRIDE  4/6/2016  
Plan assigned to (DAF)3/23/20163/23/20164/6/2016 DONE
DetailsDavid Ferguson
due 3/31 - Need tall wall engineering and revised REScheck
Routing - PLAN CHECK4/6/2016 4/6/2016 PASS
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/6/2016 DONE
Permit Ready to Issue  4/6/2016 DONE
all requirments met

RP is EXPIRED- NEED RP
1st review completed  3/30/2016 FAIL
DetailsDavid Ferguson
Routing - PLAN CHECK3/17/2016 3/30/2016 FAIL
DetailsDavid Ferguson
Plan assigned to (LEG) Tisha3/17/2016 3/23/2016 DEFR
DetailsTisha Gallop
Routing - MECHANICAL3/22/2016 3/22/2016 PASS
DetailsChad Schwendiman
Routing - MECHANICAL3/17/2016 3/21/2016 FAIL
DetailsTroy James
Emailed corrections to air comfort zone
Routing - PLANNING3/17/2016 3/18/2016 PASS
DetailsCeline Acord
Routing - PUBLIC WORKS3/17/2016 3/18/2016 PASS
Details
See Mike Sheppard regarding service stub requirements ###-####
Routing - Addressing3/17/2016 3/17/2016 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  3/17/2016 DONE
DetailsChristina Prado
Intake Approval  3/17/2016 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  3/17/2016 DONE
DetailsChristina Prado
Application received  3/16/2016 DONE
Application submitted via PDS Online on Mar 16 2016 5:05PM