BLD-Final | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### c/n made ok
|
DOC - Permit Finaled | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | FAIL |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Provide tempered glazing in windows on either side of exterior door to patio in masterbedroom. A smoke detector and CO detector required in hall way outside of sleeping rooms. All detectors must be hardwired and interconnected. Provide the blower door test result and post or the 3rd. party airseal inspection report. A correction notice has been issued.
|
BLD-Energy code compliance | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | CANC |
Mike Jordan
|
|
|
Todd Phone #: ###-####
|
BLD-Wall Bracing | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Interior wall bracing ok.
|
BLD-Energy code compliance | 6/21/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Mike Jordan
|
|
|
Todd Phone #: ###-####
|
BLD-Wall Bracing | 6/21/2016 | 6/21/2016 | 6/21/2016 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 6/16/2016 | 6/17/2016 | 6/17/2016 | A | NR |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Complete air seal pack prior to framing inspection. Correction notice posted.
|
BLD-Foundation | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | CANC |
Mike Jordan
|
|
|
Shear // Todd Phone #: ###-####
|
BLD-Wall Bracing | 5/24/2016 | 5/24/2016 | 5/24/2016 | A | PASS |
Mike Jordan
|
|
|
Shear // Todd Phone #: ###-####
|
BLD-Foundation | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | PASS |
Mike Jordan
|
|
|
Santos Phone #: ###-####
|
BLD-Footing | 4/12/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Mike Jordan
|
|
|
Santos Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/12/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 4/6/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 3/23/2016 | 3/23/2016 | 4/6/2016 | | DONE |
David Ferguson
|
|
|
due 3/31 - Need tall wall engineering and revised REScheck
|
Routing - PLAN CHECK | 4/6/2016 | | 4/6/2016 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2016 | | DONE |
|
|
|
all requirments met
RP is EXPIRED- NEED RP
|
1st review completed | | | 3/30/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/17/2016 | | 3/30/2016 | | FAIL |
David Ferguson
|
|
|
|
Plan assigned to (LEG) Tisha | 3/17/2016 | | 3/23/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 3/22/2016 | | 3/22/2016 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - MECHANICAL | 3/17/2016 | | 3/21/2016 | | FAIL |
Troy James
|
|
|
Emailed corrections to air comfort zone
|
Routing - PLANNING | 3/17/2016 | | 3/18/2016 | | PASS |
Celine Acord
|
|
|
|
Routing - PUBLIC WORKS | 3/17/2016 | | 3/18/2016 | | PASS |
|
|
|
See Mike Sheppard regarding service stub requirements ###-####
|
Routing - Addressing | 3/17/2016 | | 3/17/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/17/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/17/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/17/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2016 5:05PM
|