BLD-Aging Inspection | 10/26/2016 | 10/26/2016 | 11/1/2016 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/25/2016 | 10/25/2016 | 10/26/2016 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | PASS |
Tony Young
|
|
|
done per 325
|
BLD-Final | 6/10/2016 | 6/13/2016 | 6/13/2016 | A | PASS |
Dave Hannah
|
|
|
Final electrical, health, and plumbing have all passed as of 6/10. (I can''t see them in the system though.) Phone #: ###-#### Inspection requested via web by Brandon Pivik
|
BLD-Final | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | NR |
Phil Shearer
|
|
|
Health inspection is scheduled for 10am. Please come any time after 10am. Thank you, -Brandon Phone #: ###-#### Inspection requested via web by Brandon Pivik
|
BLD-Conference | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Tony Young
|
|
|
Need rough in inspection. Plumbing/electrical passed.
The later today the better for me. Thank you. Phone #: ###-#### Inspection requested via web by Brandon Pivik,, ok to cover,, 2nd layer sheetrock ok
|
BLD-Energy code compliance | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Tony Young
|
|
|
Need rough in inspection. Plumbing/electrical passed.
The later today the better for me. Thank you. Phone #: ###-#### Inspection requested via web by Brandon Pivik
|
BLD-Framing/Rough-in | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Tony Young
|
|
|
Brandon Phone #: ###-####,, ok to insulate,, need to complete firewall
|
BLD-Framing/Rough-in | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PART |
Tony Young
|
|
|
Brandon Phone #: ###-####,, need plumbing pass,, ok to insulate
|
BLD-Conference | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PART |
Dave Hannah
|
|
|
Need inspection of 1 hour gable and perimeter furring. Phone #: ###-#### Inspection requested via web by Brandon Pivik needs other trades to do rough in inspections ok for second layer on 1hr gable ok to insulate plumbing wall
|
Issue PAID IN FULL permit | | | 5/13/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 4/21/2016 | | 4/27/2016 | | DONE |
Tisha Gallop
|
|
|
4/21 walk-in routed to public works... home occ kitchen
|
Routing - PLAN CHECK | 4/25/2016 | | 4/27/2016 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 4/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/27/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Telephone call | | | 4/27/2016 | | DONE |
|
|
|
Spoke with Brandon informing him that his permit is ready and the fee amount that is due. He asked to speak with Public Works about SWR fees
|
Routing - PUBLIC WORKS | 4/21/2016 | | 4/25/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Environmental | 4/21/2016 | | 4/25/2016 | | PASS |
Rick Christenson
|
|
|
No issues. Minimal cooking/prep work only is done at residence. No need for grease abatement.
|
Routing PW Sewer Rating | 4/21/2016 | | 4/21/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 4/21/2016 | | 4/21/2016 | | PASS |
Laura Hunter
|
|
|
|
Plan Modification Accepted | | | 4/21/2016 | | DONE |
|
|
|
called Tisha to see if she wanted to do a plan review over counter-she is going to come out and talk to them and see if they're ready to bring it in-he brought in 1 set of drawings for the walls
|
Routing Walk-In (Zoning) | 4/8/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Josh Wilson
|
|
|
No change to exterior of existing accessory structure.
JGW 4-8-16
|
Routing Walk-In (BLD) | 4/8/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 4/8/2016 | | 4/8/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 4/8/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/8/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 4/8/2016 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 4/8/2016 | | |
|
|
|
Permit was issued twice
|
Routing Walk-In (Zoning) | 3/17/2016 | 3/17/2016 | 3/22/2016 | A | FAIL |
Leon Letson
|
|
|
Historic C of A required for external changes.
|
1st review completed | | | 3/17/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Application received | | 3/17/2016 | | | |
|
|
|
|