Permit Information
Permit NumberBLD16-00869
StatusFinaled
Name Z CONSTRUCTION INC
Site Address 7000 W VICTORY RD
Project NameCritical Systems Phase I
Customer NumberESC15-01606
ePlanReviewNo
Description
(CRITICAL SYSTEMS, Inc – Phase I – Two story enclosed area inside warehouse) Permit is to create the structural shell of a new 4,935 square foot two story area inside the existing warehouse. Note: this permit will change construction type to a VB building from a IIB building and change warehouse from an S-1 occupancy to an S-2 occupancy. Although the 2nd floor will eventually add area at this time it is unoccupied with no stairs to access the area; therefore, this permit does not increase the area of the building. The existing building is 37,762 square feet. This building is fire sprinklered for building area and fire area. Approval contingent upon adhering to the approved plans on file and attached engineering. Work to include: new isolated concrete footings, new steel columns / beams, new wood bearing walls, new i-joist floors, and new rough openings. This building is fully Fire Sprinklered with an approved Fire Alarm system. New construction will require the sprinkler system be extended to cover this area immediately in order to maintain coverage. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/16/201611/21/2016 DONE
Second Notice 9/24/201610/11/2016 DONE
mailed 10-12-16
First Notice8/30/20168/30/20169/14/2016 DONE
DetailsCandy A. Nichols
Letter of compliance/Occupancy  8/31/2016 DONE
BLD-Final8/29/20168/30/20168/30/2016PPASS
DetailsMike Jordan
Troy Phone #: ###-####
DOC - Permit Finaled8/30/20168/30/20168/30/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection8/29/20168/30/20168/30/2016APASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference6/10/20166/10/20166/10/2016PDONE
DetailsTroy Cobbley
I spoke to Phil about not allowing a "ok to cover" until the combustible concealed wall cavities had been addressed with additional sprinkler protection or meeting another section of code in NFPA 13.
BLD-Footing4/22/20164/26/20164/26/2016APASS
DetailsPhil Shearer
Troy Phone #: ###-####
BLD-Footing4/20/20164/20/20164/20/2016PFAIL
DetailsPhil Shearer
Troy Phone #: ###-####. Can not use CMU block to hold up reber.
Override - Parcel Holds  4/19/2016  
Issue PAID IN FULL permit  4/19/2016 DONE
Inspection Record Card- Bld  4/19/2016 DONE
Telephone call  4/1/2016 DONE
talked to Billie-told her we need the GC form from contractor and they have to be registered thru idaho. Also we need the GC company to call us so we can get them set up in Tidemark
Plan assigned to (TLW)3/17/2016 3/31/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK  3/31/2016 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/31/2016 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/31/2016 DONE
Inspection Record Card- Bld  3/31/2016 DONE
Permit Ready to Issue  3/31/2016 DONE
Need Cert of Value for issuance C_P 4/19///need the GC and rev cert of val
Telephone call  3/31/2016 DONE
Left a message for Troy informing him that the permit is ready and that the GC needs to fill out a 302 and a 306 so we can put in the fees and be paid for issuance
Routing - FIRE3/29/20163/29/20163/30/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PLAN CHECK3/17/2016 3/23/2016 FAIL
DetailsTim L. Woodard
Need to meet type IIB construction and provide additional calculations. TLW
1st review completed  3/23/2016 DONE
Plans ACCEPTED BY PLAN TECH  3/17/2016 DONE
Intake Approval  3/17/2016 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  3/17/2016 DONE
Application received 3/17/2016