BLD-Final | 1/17/2018 | 1/18/2018 | 1/18/2018 | P | NR |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Nees zoning final and provide special inspection final letter.
|
BLD-Foundation | 6/6/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Phil Shearer
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/3/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Phil Shearer
|
|
|
Dane Phone #: ###-####
|
BLD-Wall Bracing | 6/2/2016 | 6/3/2016 | 6/3/2016 | P | CANC |
Phil Shearer
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/3/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 4/28/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 3/18/2016 | 3/18/2016 | 4/28/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing Off Site - STRUCTURAL | 4/21/2016 | | 4/28/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/22/2016 | | 4/28/2016 | | PASS |
Carl D Madsen
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/28/2016 | | DONE |
|
|
|
called John to let permit is ready and that we still need GC, Rev cert of val & RP
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/28/2016 | | DONE |
|
|
|
*******MET********Need GC Form, Revised Value and RP
|
Routing - PLANNING | 4/22/2016 | | 4/22/2016 | | PASS |
Susan Riggs
|
|
|
|
Plan resubmittals received | | | 4/22/2016 | | DONE |
|
|
|
received (3) sets of engineered plans for pedestrian bridge
|
Routing Off Site - STRUCTURAL | 3/18/2016 | | 4/11/2016 | | FAIL |
Carl D Madsen
|
|
|
The reveiw comments were sent to Brian Smith
|
Routing - PLAN CHECK | 3/30/2016 | | 4/11/2016 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/11/2016 | | FAIL |
|
|
|
Failed pending Posting of bond and structural review.
|
Routing - Erosion and Sediment | 3/30/2016 | | 3/30/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
The Construction of a New Pedestrian Bridge
|
Routing PW Flood Plain | 3/21/2016 | | 3/28/2016 | | PASS |
Jim Wyllie
|
|
|
Building permit submittal is for the bridge. Pedestrian pathway shown on the plans is not included in this permit and is not approved for construction. Pedestrian pathway is proposed to be constructed in the floodplain above existing grade. This is not permitted unless applicant submits a "No-Rise" floodplain certification for that portion of the path located in the floodplain. Pathway can be constructed if it is installed at or below existing grade.
Jim Wyllie / ###-####
|
Routing PW Drainage | 3/28/2016 | | 3/28/2016 | | CANC |
Brian Murphy
|
|
|
No review required per Brian Murphy.
|
Routing - PUBLIC WORKS | 3/21/2016 | | 3/28/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING Land Div | 3/18/2016 | | 3/21/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 3/21/2016 | | 3/21/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/18/2016 | | DONE |
|
|
|
|
Intake Approval | | | 3/18/2016 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/18/2016 | | DONE |
|
|
|
|
Application received | | 3/17/2016 | | | |
|
|
|
Waiting for third set
|
Routing - PLANNING | 3/28/2016 | | | | FAIL |
Susan Riggs
|
|
|
The applicant must submit a second set of bis for the bridge and post the bond.
|