BLD-Final | 10/11/2017 | 10/17/2017 | 10/17/2017 | P | NR |
Tony Young
|
|
|
Call half before // Phone #: ###-#### Inspection requested via web by Brodie Schmidt,, needs to meet barrior requirements
|
BLD-Final | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | FAIL |
Tony Young
|
|
|
Brodie Phone #: ###-####,, barrior requirements not met
|
BLD-Aging Inspection | 12/29/2016 | 12/29/2016 | 12/29/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/28/2016 | 12/28/2016 | 12/29/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PART |
Tony Young
|
|
|
Randy or ###-#### Bill-wall Phone #: ###-####,, edge wall caps on retaining wall areas,, cantelevered beam,,, ok
|
BLD-Foundation | 4/25/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Tony Young
|
|
|
rebar; Brody Phone #: ###-####
|
PubWorks Subgrade Approval | 4/21/2016 | 4/21/2016 | 4/21/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/5/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 4/4/2016 | | |
|
|
|
|
Telephone call | | | 4/4/2016 | | DONE |
|
|
|
Spoke with Ken informing him that this permit is ready and the fee amount that is due
|
Plan resubmittals received | | | 4/4/2016 | | DONE |
|
|
|
one copy of existing esc narrative
|
Routing - Erosion and Sediment | 4/4/2016 | | 4/4/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and approval required prior to earth disturbance)
Permit to install a fully engineered 360 sq. ft. in ground gunite swimming pool with a salt disinfection system, sand filter system and gas heating system. Dwelling doors to pool area are to have audible alarm in accordance with UL2017 and barrier surrounding rear yard
|
Inspection Record Card- Bld | | | 4/4/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/4/2016 | | 4/4/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/4/2016 | | DONE |
|
|
|
All Met
|
Plan assigned to (LEG) Tisha | 3/21/2016 | | 4/4/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 3/24; erosion, plan check
|
Routing - PLAN CHECK | 3/22/2016 | | 3/24/2016 | | FAIL |
Tisha Gallop
|
|
|
need to show barrier locations on plan; called Keneth Schmidt/Applicant and told him resubmittal requirements for erosion and plan check.
|
1st review completed | | | 3/24/2016 | | FAIL |
|
|
|
|
Routing - Erosion and Sediment | 3/21/2016 | | 3/22/2016 | | FAIL |
Evan Jenkins
|
|
|
Full Erosion and Sediment Control Narrative (Plan) and Site Map required due to size and Environmentally Sensative (Hillside) the project is. Evan Jenkins 794.3958
|
Plans ACCEPTED BY PLAN TECH | | | 3/21/2016 | | DONE |
|
|
|
|
Intake Approval | | | 3/21/2016 | | PASS |
|
|
|
|
Routing - PLANNING | 3/21/2016 | | 3/21/2016 | | PASS |
Sue Cummings
|
|
|
pool only
|
Routing PW Grading-Hillside | | | 3/21/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Application received | | 3/21/2016 | | | |
|
|
|
|