Permit Information
Permit NumberBLD16-00912
StatusFinaled
Name BUILDING RESOURCES INC
Site Address 1221 W BOISE AVE
Project NameVanilla
Customer Number 
ePlanReviewNo
Description
**(Vanilla)** NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE Permit for tenant improvements to an existing restaurant with work to include plumbing, mechanical, electrical, a new cooler, type 1 hood new appliances and related interior finishes per the approved plans. This permit also includes the installation of a new 1,500 gallon grease interceptor per public works requirements. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/20/20179/14/2017 DONE
This permit finaled on the web by Candy Nichols
First Notice8/2/20178/2/20178/10/2017 DONE
DetailsJim Storey
Mailed 8-11-17
Telephone call  8/7/2017 DONE
Recieved call from fire prevention officer (FPO) concerned about tenant advertising opening of business and not currently having an occupancy permit application in the system. Advised FPO to inform tenant to contact Building Division (###-####) and get an occupancy permit application turned in.
BLD-Final8/1/20178/2/20178/2/2017PPASS
DetailsJim Storey
greg - call prior for access Phone #: ###-#### Permit was re-assigned to a "vanilla" tenant inprovement. Prior to future occupants the door hardware on the north doors will need to be changed to panic hardware, designated exits on the south and east side will need to be changed to single action door hardware with thumbturn deadbolts removed. There is an issued FIR permit for the commercial hood fire suppression system (FIR17-00079) but no inspection can be performed due to no cooking equipment being installed, prior to next tenant the issued FIR permit will need to be inspected and completed. No fire extinguishers
DOC - Permit Finaled8/2/20178/2/20178/2/2017PPASS
DetailsJim Storey
Permit was re-assigned to a "vanilla" tenant inprovement. Prior to future occupants the door hardware on the north doors will need to be changed to panic hardware, designated exits on the south and east side will need to be changed to single action door hardware with thumbturn deadbolts removed. There is an issued FIR permit for the commercial hood fire suppression system (FIR17-00079) but no inspection can be performed due to no cooking equipment being installed, prior to next tenant the issued FIR permit will need to be inspected and completed. No fire extinguishers
FIRE-Final Inspection8/1/20178/2/20178/2/2017PPASS
DetailsJim Page
Permit was re-assigned to a "vanilla" tenant inprovement. Prior to future occupants the door hardware on the north doors will need to be changed to panic hardware, designated exits on the south and east side will need to be changed to single action door hardware with thumbturn deadbolts removed. There is an issued FIR permit for the commercial hood fire suppression system (FIR17-00079) but no inspection can be performed due to no cooking equipment being installed, prior to next tenant the issued FIR permit will need to be inspected and completed. No fire extinguishers installed at time of inspection, fire extinguishers are not required under a vanilla TI. No occupancy allowed under this life fire safety inspection, life fire safety inspection complete for vanilla finish.
Inspection Record Card- Bld  8/1/2017 DONE
Inspection Record Card- Bld  8/1/2017 DONE
BLD-Energy code compliance12/14/201612/16/201612/16/2016APASS
DetailsJim Storey
Insulation // Braven Phone #: ###-####
BLD-Framing/Rough-in12/9/201612/13/201612/13/2016APART
DetailsJim Storey
Braven Phone #: ###-#### framing/ ada backing and door thesholds. ok to insulate
Issue PAID IN FULL permit  10/4/2016 DONE
Routing - FIRE10/3/201610/3/201610/3/2016 PASS
DetailsScott Arellano
Revised report attached to plans.
Plan assigned to (CDM)3/22/20163/22/201610/3/2016 PASS
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK8/19/2016 10/3/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/3/2016 10/3/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/3/2016 DONE
Permit Ready to Issue  10/3/2016 DONE
need GC Form
Print Occupancy Form  10/3/2016 DONE
Routing - PLUMBING9/26/2016 9/27/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Erosion and Sediment9/27/2016 9/27/2016 CANC
DetailsAndy J. Long
No ESC permit or review required at this time per conversation with Building Resources GC
Routing - PUBLIC WORKS9/26/2016 9/26/2016 PASS
DetailsRachael Beierle
Routing PW Environmental9/26/2016 9/26/2016 PASS
DetailsRick Christenson
1500 Gallon Exterior Interceptor Approved
Plan resubmittals received  9/21/2016 DONE
received two copies of sheet P-1- gave to the plan reviewer
Routing - FIRE8/19/20168/19/20168/19/2016 FAIL
DetailsKatie Marron
Report attached to plans and emailed to architect.
1st review completed  8/19/2016 FAIL
Failed Plan Check, Public Works/Environmental, Plumbing and Fire.
Routing - PLAN CHECK8/5/2016 8/18/2016 FAIL
DetailsCarl D Madsen
Failed pending plumbing and public works resubmittals and approval. CDM
Routing PW Environmental8/8/2016 8/9/2016 FAIL
DetailsRick Christenson
Needs properly sized Grease Trap. No Grease Trap shown.
Routing - PUBLIC WORKS8/8/2016 8/9/2016 FAIL
DetailsRachael Beierle
Needs grease trap abatement for pretreatment. No plans supplied.
Routing - PLUMBING8/9/2016 8/9/2016 FAIL
DetailsBill VanDegrift
1) Provide public works pretreatment with the information they require and submit any plumbing changes.
2) the restroom being reinstalled in room 005 will need a rough in inspection.
Routing - MECHANICAL8/9/2016 8/9/2016 PASS
DetailsTroy James
Routing PW Sewer Rating8/8/2016 8/8/2016 PASS
DetailsRachael Beierle
Routing - Addressing8/8/2016 8/8/2016 PASS
DetailsLaura Hunter
Plan resubmittals received  8/5/2016 DONE
Two copies of Specifications and Hood information packets. Three copies of sheets A1, A2, E1, H-1 and H-2 taken to Carl M
Routing - PLAN CHECK3/22/2016 3/30/2016 FAIL
DetailsCarl D Madsen
EMailed plan review report to Barry at Building Resources.
1st review completed  3/30/2016 FAIL
Plans ACCEPTED BY PLAN TECH  3/22/2016 DONE
Intake Approval  3/22/2016 PASS
Recd Pcfee & Taken To Pln CK  3/22/2016 DONE
Application received 3/22/2016   
DetailsScott Arellano