BLD-Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
Zoning Approval | 6/8/2016 | 6/8/2016 | 6/8/2016 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Telephone call | | | 6/1/2016 | | DONE |
|
|
|
called Jeff LIkes-according to Adele Jeff wants to do a plan mod but nothig has been turned in on changes he said were made.-left message on his phone-called Mike to let know the final can not be done until the P & Z inspecftion is scheduled and complete
|
CHANGE STATUS TO (ISS) | | | 6/1/2016 | | DONE |
|
|
|
as per Jeff LIkes-no plan mod is going to be done so no changes to be made
|
Telephone call | | | 6/1/2016 | | DONE |
|
|
|
called Mike to let know Jeff Likes said no plan mod to be done so he will call in his final insp once the P & Z insp has been done
|
BLD-Final | 5/19/2016 | 5/20/2016 | 5/20/2016 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### temp ok pending zonning sign offs no card on site
|
FIRE-Final Inspection | 5/18/2016 | 5/19/2016 | 5/20/2016 | A | PART |
Jim Page
|
|
|
No fire sprinklers, no fire alarm panel, fire extinguishers are in place with current inspection tags, exit signs are in place and operational, in duct detectors are stand alone and duct detectors have been tested/passed. There are multiple doors throughout the space that have round type door hardware installed, informed general contractor that the round type door hardware may need to be changed to paddle type door hardware based on final building inspector requirements. Exterior exit doors have a maglock assemblies installed on door frame with push button exit only, doors with maglocks need to have sensors as well as push button operation installed on egress side for door release. Life fire safety inspection is complete with exception to maglock release, life fire safety can be finaled once maglock operation has been tested and inspected.
|
Routing - PLAN CHECK | 5/20/2016 | | 5/20/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
comments not addressed
|
BLD-Framing/Rough-in | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Jim Storey
|
|
|
Created 3 window openings through exterior wall. Need you to look at framing. Phone #: ###-#### Inspection requested via web by Ron Hack
|
BLD-Framing/Rough-in | 4/27/2016 | 4/28/2016 | 4/28/2016 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Hack partition walls only ok pending trade aproval
|
Issue PAID IN FULL permit | | | 4/27/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/27/2016 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 3/25/2016 | 3/25/2016 | 4/26/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Level 2 Stinker Store Office
|
Routing - PLAN CHECK | 4/26/2016 | | 4/26/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/26/2016 | | DONE |
|
|
|
all requirments met
Need GC Form and Revised Cert of Value
|
Routing - PLAN CHECK | 4/22/2016 | | 4/22/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PUBLIC WORKS | 4/7/2016 | | 4/7/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLAN CHECK | 4/7/2016 | | 4/7/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 3/25/2016 | | 4/5/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PUBLIC WORKS | 3/25/2016 | | 4/5/2016 | | PASS |
Jennifer Bruner
|
|
|
|
1st review completed | | | 4/5/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 3/25/2016 | | 3/29/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 3/25/2016 | | 3/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 3/25/2016 | | PASS |
David Ferguson
|
|
|
|
Application received | | | 3/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 22 2016 12:54PM
|