BLD-Final | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Jim Storey
|
|
|
Rocco Phone #: ###-####
|
DOC - Permit Finaled | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 2/7/2017 | 2/7/2017 | 2/15/2017 | | NR |
Jim Storey
|
|
|
HANDRAIL REQUIRED
|
BLD-Aging Inspection | 2/8/2017 | 2/8/2017 | 2/8/2017 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | FAIL |
Jim Storey
|
|
|
Rocco Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PASS |
Jim Storey
|
|
|
Rocco Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | DEFR |
Jim Storey
|
|
|
Rocco Phone #: ###-#### out of time defred to monday am
|
BLD-Wall Bracing | 9/9/2016 | 9/12/2016 | 9/12/2016 | A | PASS |
Jim Storey
|
|
|
Shear // Rocco Phone #: ###-####
|
BLD-Conference | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PASS |
Jim Storey
|
|
|
Call prior to going Phone #: 2089190586 >> Inspection requested via mobile web by Ben Sears
|
BLD-Footing | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Jim Storey
|
|
|
Phone #: 2089190586 >> Inspection requested via mobile web by Ben Sears
|
PubWorks Subgrade Approval | 7/11/2016 | 7/11/2016 | 7/11/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | NR |
Jim Storey
|
|
|
Darren Phone #: ###-#### pw sign off required
|
Issue PAID IN FULL permit | | | 6/21/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 5/20/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 5/20/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Andrea Tuning
|
|
|
|
Routing Walk-In (BLD) | 5/20/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Routing Walk-In (PW Hillside) | 5/20/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Erosion and Sediment | 5/20/2016 | | 5/20/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and approval required prior to earth disturbance)
Permit for new 30' x 36' detached shop (1080 square feet) with fixted stairs to attic storage space and approx. 400 sq. ft. shop area that will not be conditioned. See engineering for foundation walls, footings, headers and wall bracing. Separate erosion and electrical permits are requried.
|
Inspection Record Card- Bld | | | 5/20/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/20/2016 | | DONE |
|
|
|
all requirments met
|
Plan assigned to (LEG) Tisha | 5/20/2016 | | 5/20/2016 | | DONE |
Tisha Gallop
|
|
|
routed to esc
|
Telephone call | | | 5/20/2016 | | DONE |
|
|
|
notified customer that permit is ready
|
Routing Walk-In (BLD) | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | FAIL |
Tisha Gallop
|
|
|
need zoning cert (over 1000 sq. ft), need engineering for foundation (hillside), need erosion waiver or plan
|
1st review completed | | | 3/22/2016 | | DONE |
|
|
|
|
Application received | | 3/22/2016 | | | |
|
|
|
|