Third Notice | | 2/18/2017 | 3/10/2017 | | DONE |
Christina Prado
|
|
|
Mailed again with more information for completion, will check back 4/09/17
|
Third Notice | | 1/16/2017 | 2/13/2017 | | DONE |
Christina Prado
|
|
|
Mailed 2/13/17
|
Third Notice | | 12/17/2016 | 1/11/2017 | | DONE |
|
|
|
|
Third Notice | | 11/22/2016 | 12/12/2016 | | DONE |
|
|
|
sent with a letter
|
Third Notice | | 10/15/2016 | 11/17/2016 | | DONE |
|
|
|
|
Third Notice | | 9/24/2016 | 10/10/2016 | | DONE |
|
|
|
|
Second Notice | | 8/22/2016 | 9/19/2016 | | DONE |
|
|
|
|
First Notice | | 7/22/2016 | 8/12/2016 | | DONE |
Carlos Velazquez
|
|
|
|
BLD-Final | 7/6/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Jim Sly
|
|
|
would like call ahead; Dave Phone #: ###-####
|
Permanent Occupancy | | | 7/12/2016 | | DONE |
|
|
|
|
BLD-Final | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | NH |
Mike Jordan
|
|
|
Dave Phone #: ###-####. No one at place of bussiness. Doors locked. Still needs plumbing.
|
BLD-Final | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PART |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Ok for temp occ. Provide occ. sensors were required. Pocket door has been made inapporable. PLumbing is on temp as well.
|
FIRE-Final Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Owner is going to make the pocket door in-operative instead of supply ADA hardware on it.
|
BLD-Final | 6/15/2016 | 6/16/2016 | 6/16/2016 | A | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Needs fire/life/safety inspection.
|
BLD-Framing/Rough-in | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Doors locked, no ine here, no access. Will need to reschedule.
|
BLD-Conference | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | DONE |
Mike Jordan
|
|
|
stop by project to check on progress, all MEP rough in inspections are completed. Framing is completed and majority covered. Also noted clearance issue with restroom door, side approach latch side, pull. Aslo noted elevated platform constructed that is not on plans. Tenant is removing some shhet rock for inspection, moving door to meet min clearance and will insulate under platform and then call in for frming inspection.
|
Issue PAID IN FULL permit | | | 4/25/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/25/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 3/24/2016 | | 4/22/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 4/19 L3 A+ Nail Salon change in occupancy ePlan
|
Routing - PLAN CHECK | 4/22/2016 | | 4/22/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/22/2016 | | DONE |
|
|
|
need GC & rev cert of val
|
Routing - PLUMBING | 4/21/2016 | | 4/21/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PLAN CHECK | 4/21/2016 | | 4/21/2016 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 4/18/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLAN CHECK | 3/24/2016 | | 4/18/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 3/24/2016 | | 4/1/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 3/24/2016 | | 3/28/2016 | | PASS |
Katie Marron
|
|
|
No comments attached.
|
Routing - Design Review | 3/24/2016 | | 3/28/2016 | | PASS |
Sarah Schafer
|
|
|
No exterior remodel. TLW
The use is allowed in the zone and there are no exterior changes.
|
Routing - PLUMBING | 3/24/2016 | | 3/24/2016 | | FAIL |
Daryl Spivey
|
|
|
Auto vents not approved for commercial work and drains for pedicure and hair stations not installed to code.
|
Routing - Addressing | 3/24/2016 | | 3/24/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/24/2016 | | 3/24/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 3/24/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Pending Assignment by TLW | 3/24/2016 | | 3/24/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 3/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 22 2016 2:07PM
|
Intake Approval | | | 3/22/2016 | | FAIL |
David Ferguson
|
|
|
you are proposing to sawcut the floor for new plumbing. It also appears that this exceeds 40 lineal ft. which would require a Erosion and Sediment Control Waiver letter.
|