Permit NumberBLD16-00926
StatusFinaled
Name AN NGUYEN
Site Address 12160 W OVERLAND RD
Project NameLa Vie Nail Spa
Customer Number 
ePlanReviewYes
Description
**(LA VIE NAIL SPA)** Permit to remodel an existing 1,942 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing wall/door, construction of select interior nonbearing walls to create a relaxation room, a hallway, and a wall partition at the salon floor area, altering the existing storage room to create a new restroom to meet current accessibility standards, some electrical work, some plumbing work, some mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is not sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/18/20173/10/2017 DONE
DetailsChristina Prado
Mailed again with more information for completion, will check back 4/09/17
Third Notice 1/16/20172/13/2017 DONE
DetailsChristina Prado
Mailed 2/13/17
Third Notice 12/17/20161/11/2017 DONE
Third Notice 11/22/201612/12/2016 DONE
sent with a letter
Third Notice 10/15/201611/17/2016 DONE
Third Notice 9/24/201610/10/2016 DONE
Second Notice 8/22/20169/19/2016 DONE
First Notice 7/22/20168/12/2016 DONE
DetailsCarlos Velazquez
BLD-Final7/6/20167/12/20167/12/2016APASS
DetailsJim Sly
would like call ahead; Dave Phone #: ###-####
Permanent Occupancy  7/12/2016 DONE
BLD-Final7/5/20167/6/20167/6/2016ANH
DetailsMike Jordan
Dave Phone #: ###-####. No one at place of bussiness. Doors locked. Still needs plumbing.
BLD-Final6/16/20166/16/20166/16/2016PPART
DetailsMike Jordan
Dave Phone #: ###-####. Ok for temp occ. Provide occ. sensors were required. Pocket door has been made inapporable. PLumbing is on temp as well.
FIRE-Final Inspection6/16/20166/16/20166/16/2016PPASS
DetailsTroy Cobbley
Life safety passed. Owner is going to make the pocket door in-operative instead of supply ADA hardware on it.
BLD-Final6/15/20166/16/20166/16/2016ANR
DetailsMike Jordan
Dave Phone #: ###-####. Needs fire/life/safety inspection.
BLD-Framing/Rough-in5/20/20165/20/20165/20/2016PPASS
DetailsMike Jordan
BLD-Framing/Rough-in5/19/20165/20/20165/20/2016ANR
DetailsMike Jordan
Dave Phone #: ###-####. Doors locked, no ine here, no access. Will need to reschedule.
BLD-Conference5/19/20165/19/20165/19/2016PDONE
DetailsMike Jordan
stop by project to check on progress, all MEP rough in inspections are completed. Framing is completed and majority covered. Also noted clearance issue with restroom door, side approach latch side, pull. Aslo noted elevated platform constructed that is not on plans. Tenant is removing some shhet rock for inspection, moving door to meet min clearance and will insulate under platform and then call in for frming inspection.
Issue PAID IN FULL permit  4/25/2016 DONE
Print Occupancy Form  4/25/2016 DONE
Plan assigned to (JG)3/24/2016 4/22/2016 PASS
DetailsJavier Guzman
1st review completed, 4/19 L3 A+ Nail Salon change in occupancy ePlan
Routing - PLAN CHECK4/22/2016 4/22/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/22/2016 DONE
Permit Ready to Issue  4/22/2016 DONE
need GC & rev cert of val
Routing - PLUMBING4/21/2016 4/21/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - PLAN CHECK4/21/2016 4/21/2016 FAIL
DetailsJavier Guzman
1st review completed  4/18/2016 FAIL
DetailsJavier Guzman
ePlan
Routing - PLAN CHECK3/24/2016 4/18/2016 FAIL
DetailsJavier Guzman
Routing - MECHANICAL3/24/2016 4/1/2016 PASS
DetailsTroy James
Routing - FIRE3/24/2016 3/28/2016 PASS
DetailsKatie Marron
No comments attached.
Routing - Design Review3/24/2016 3/28/2016 PASS
DetailsSarah Schafer
No exterior remodel. TLW

The use is allowed in the zone and there are no exterior changes.
Routing - PLUMBING3/24/2016 3/24/2016 FAIL
DetailsDaryl Spivey
Auto vents not approved for commercial work and drains for pedicure and hair stations not installed to code.
Routing - Addressing3/24/2016 3/24/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/24/2016 3/24/2016 PASS
DetailsJennifer Bruner
Intake Approval  3/24/2016 PASS
DetailsTim L. Woodard
Pending Assignment by TLW3/24/2016 3/24/2016 DONE
DetailsTim L. Woodard
Application received  3/22/2016 DONE
Application submitted via PDS Online on Mar 22 2016 2:07PM
Intake Approval  3/22/2016 FAIL
DetailsDavid Ferguson
you are proposing to sawcut the floor for new plumbing. It also appears that this exceeds 40 lineal ft. which would require a Erosion and Sediment Control Waiver letter.