First Notice | | 6/12/2016 | 7/26/2016 | | DONE |
|
|
|
A first notice came in the mail 7/26/16 for BLD16-00927
|
Print Statement | | | 7/26/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/2/2016 | | DONE |
|
|
|
|
BLD-Final | 5/31/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Dave Hannah
|
|
|
Lucio Phone #: ###-####
|
FIRE-Final Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been repaired, commercial hood suppression system inspection has been completed, final life fire safety inspection passed/complete.
|
Temporary Occupancy | 6/1/2016 | 8/30/2016 | 6/1/2016 | | DONE |
Carlos Velazquez
|
|
|
|
FIRE-Final Inspection | 5/17/2016 | 5/24/2016 | 5/24/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide permit as original request for the hood suppression system and repair the exit signs.
|
BLD-Final | 3/31/2016 | 4/4/2016 | 4/4/2016 | A | NR |
Dave Hannah
|
|
|
Gary Phone #: ###-#### or Lucio ###-####
|
FIRE-Final Inspection | 3/31/2016 | 4/4/2016 | 4/4/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide permit for hood system modifications, provide re-certification for fire extinguishers, repair all exit signs and emeregency lights,cover all exposed electrical outlets, remove dead bolt on storage room under stairs.
|
CHANGE STATUS TO (ISS) | | | 3/30/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/29/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 3/29/2016 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 3-30-16 /CEV
waiting for letter from parcel owner saying it's ok for the tenant to do work
|
Routing - FIRE | 3/28/2016 | 3/28/2016 | 3/28/2016 | | PASS |
Scott Arellano
|
|
|
Comments attached to case. Hood suppression permit required.
|
Plan assigned to (AJS) | 3/22/2016 | 3/22/2016 | 3/28/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
my review completed Old Flat Bread Space
|
Routing - PLAN CHECK | 3/22/2016 | | 3/28/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 3/28/2016 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 3/28/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/28/2016 | | DONE |
|
|
|
****mets***need GC-no rev cert of val since Lucio Prado is doing the work-he will bring in the GC form and a letter from the parcel owner
|
Telephone call | | | 3/28/2016 | | DONE |
|
|
|
Left a message for Lucio Prado that the permit is ready and a GC Form and Revised Cert of Value is needed.
|
Routing - Addressing | 3/22/2016 | | 3/23/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/22/2016 | | 3/23/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Environmental | 3/23/2016 | | 3/23/2016 | | PASS |
Terry Alber
|
|
|
No changes to kitchen. Existing grease abatement in alley.
|
Plans ACCEPTED BY PLAN TECH | | | 3/22/2016 | | DONE |
|
|
|
|
Intake Approval | | | 3/22/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/22/2016 | | DONE |
|
|
|
|
Application received | | 3/22/2016 | | | |
|
|
|
|