Permit Information
Permit NumberBLD16-00963
StatusFinaled
Name BOISE INTERNATIONAL MARKET LLC
Site Address 5823 W FRANKLIN RD
Project NameBIM Fire Damage Repairs
Customer Number 
ePlanReviewYes
Description
(BOISE INTERNATIOAL MARKET)(STRUCTURAL FIRE DAMAGE REPAIR ONLY)(NO OCCUPANCY ALLOWED UNDER THIS PERMIT) Permit for demo and re construction of fire damaged roof beams, joists, sheathing and roof assembly per engineered design. Special inspection as shown on #310. Remove damaged HVAC units. No Occupancy is being requested. This building is NOT fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/7/201612/7/201612/12/2016 DONE
DetailsMike Jordan
Mailed 12-13-16
BLD-Final12/6/201612/7/201612/7/2016PPASS
DetailsMike Jordan
miguel Phone #: ###-####
DOC - Permit Finaled12/7/201612/7/201612/7/2016PPASS
DetailsMike Jordan
BLD-Final12/5/201612/6/201612/6/2016PNR
DetailsMike Jordan
Call before to meet // Magel Phone #: ###-####. Needs zoninf final.
FIRE-Final Inspection12/5/201612/6/201612/6/2016APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval12/6/201612/6/201612/6/2016 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in9/12/20169/13/20169/13/2016APASS
DetailsMike Jordan
would like call ahead; Francisco Phone #: ###-####
BLD-Framing/Rough-in9/9/20169/9/20169/9/2016PNR
DetailsMike Jordan
Fransico Phone #: ###-####. Unable to conduvt inspection due to type of work being done on project.
BLD-Framing/Rough-in8/19/20168/19/20168/19/2016PPART
DetailsMike Jordan
David Phone #: ###-####. Ok to sheet. Need RFI from engineer for epoxy into existing CMU. CMU is hollow at this location. Also notified contractor that special inspection is required on epoxy.
Inspection Record Card- Bld  8/10/2016 DONE
Issue PAID IN FULL permit  8/10/2016 DONE
OVERRIDE  6/8/2016  
Plan assigned to (AJS)3/24/20163/24/20166/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed International Market Structural
Routing - PLAN CHECK6/2/2016 6/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL6/2/2016 6/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/8/2016 DONE
Permit Ready to Issue  6/8/2016 DONE
***still needs RP 7-22-16 /CEV

Needs; RP, GC Form, Revised Certificate of Value
Routing - PLAN CHECK5/4/2016 5/16/2016 FAIL
DetailsAdele J Schaffeld-Griffin
pending structral approval
Routing Off Site - STRUCTURAL5/4/2016 5/16/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK3/24/2016 4/13/2016 FAIL
DetailsAdele J Schaffeld-Griffin
pending structural approval
Routing Off Site - STRUCTURAL3/24/2016 4/13/2016 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  4/13/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE3/24/20163/24/20163/28/2016 PASS
DetailsKatie Marron
No comments attached.
Application received  3/24/2016 DONE
Application submitted via PDS Online on Mar 24 2016 9:25AM
Intake Approval  3/24/2016 PASS
Pending Assignment by TLW3/24/2016 3/24/2016 DONE
DetailsTim L. Woodard
Routing - Design Review3/24/2016 3/24/2016 PASS
DetailsJosh Wilson
No exterior changes proposed.