Permit Information
Permit NumberBLD16-00964
StatusFinaled
Name THE PROFESSIONALS
Site Address 8950 W EMERALD ST Unit: 158
Project NameRecovery 4 Life Suite 158
Customer NumberBLD16-00896
ePlanReview 
Description
(RECOVERY 4 LIFE – Suite 158) To remodel a 2,395 sq. ft. tenant space by dividing the space into two tenant spaces with existing common restrooms/hallway. This tenant space suite #158 will be 1,459 sq. ft., the adjacent space suite #156 will be 936 sq. ft. permitted under BLD16-00896. NOTE: This building is fully fire sprinklered for area increase and corridors have been downgraded and are not required to be rated. Work is to include: construction of select interior nonbearing walls to create (3) new offices, a hallway, and wall infill to separate tenant spaces, relocate existing light fixture, electrical work, relocate mechanical ductwork and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/25/20167/11/2016 DONE
Mailed 7-12
First Notice 5/12/20166/15/2016 DONE
Permanent Occupancy  5/2/2016 DONE
BLD-Final4/29/20164/29/20164/29/2016PPASS
DetailsMike Jordan
Nick Phone #: ###-####
FIRE-Final Inspection4/29/20164/29/20164/29/2016PPASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in4/20/20164/20/20164/20/2016PPASS
DetailsMike Jordan
Nick Phone #: ###-####
Issue PAID IN FULL permit  4/19/2016 DONE
Print Occupancy Form  4/19/2016 DONE
Permit Ready to Issue  4/18/2016 DONE
need rev cert of val
Telephone call  4/18/2016 DONE
called customer to let know they need to come pick up the 2nd half fo the permit for this project-they picked up BLD16-00896
Plan assigned to (JG)3/24/20163/24/20164/5/2016 PASS
DetailsJavier Guzman
4/06 L2 Recovery 4 Life ePlan
Routing - PLAN CHECK3/24/2016 4/5/2016 PASS
DetailsJavier Guzman
Routing - PUBLIC WORKS3/24/2016 4/5/2016 PASS
DetailsRachael Beierle
1st review completed  4/5/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/5/2016 DONE
Routing - Addressing3/24/2016 4/4/2016 PASS
DetailsLaura Hunter
Contractor submitted wrong suite number with plans. Correct suite number is 158
Application received  3/24/2016 DONE
Application submitted via PDS Online on Mar 24 2016 9:39AM
Intake Approval  3/24/2016 PASS
DetailsDavid Ferguson