Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD16-00971
StatusFinaled
Name IDAHO TOWER CONSTRUCTION CO
Site Address 999 W MAIN 10TH FLOOR
Project NameAT&T Capital Center
Customer Number 
ePlanReviewYes
Description
(AT&T – CAPITAL CENTER - ROOF TOP ANTENNAS) Permit for the modifications to the existing cellular roof top penthouse wall antenna mount assembly with work to include adding Add (6) new Andrew SBNHH-1D65A antennas, add (3) RRH4x25-WCS-4R, add (3) RRH2x40-AWS+RDEM, add (1) Raycap Squid, add (3) DC and (1) Fiber lines, relocate existing Andrew SBNHH-1D65A and Powerwave 7750 antennas in Beta sector. There will be some minor equipment modifications within the existing shelter, but no changes to the rooftop space or the height of the building. Structural engineering and plans provided. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice10/7/201610/7/20164/16/2019 DONE
DetailsDave Hannah
This permit finaled on the web by Dwayne Robinson
BLD-Final10/6/201610/7/201610/7/2016APASS
DetailsDave Hannah
Duane Phone #: ###-####
DOC - Permit Finaled10/7/201610/7/201610/7/2016PPASS
DetailsDave Hannah
Issue PAID IN FULL permit  6/10/2016 DONE
(F) Reprint permit  6/10/2016 DONE
Plan assigned to (JG)5/13/20165/13/20166/6/2016 PASS
DetailsJavier Guzman
1st review completed, 5/19 L1 AT&T cell tower replacement antena ePlan
Routing - PLAN CHECK6/6/2016 6/6/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/6/2016 DONE
Permit Ready to Issue  6/6/2016 DONE
MET Needs; GC Form Revised Cert of Value
Routing - PLAN CHECK5/13/2016 5/17/2016 FAIL
DetailsJavier Guzman
ePlan
1st review completed  5/17/2016 FAIL
DetailsJavier Guzman
Routing - Addressing5/13/2016 5/16/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/13/2016 5/16/2016 PASS
DetailsRachael Beierle
Routing - PLANNING5/13/2016 5/16/2016 PASS
DetailsCeline Acord
Intake Approval  5/13/2016 PASS
DetailsJavier Guzman
Intake Approval  4/18/2016 FAIL
DetailsJavier Guzman
1. Please provide full engineering structural calculations
2. Please provide structural engineering calculations to include the added weight to the existing building roof structure for the proposed batteries in the existing equipment shelter
Application received  3/24/2016 DONE
Application submitted via PDS Online on Mar 24 2016 1:23PM