Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-01003
StatusFinaled
Name HIGHLAND HOMES LLC
Site Address 5820 W HILL RD
Project NameMichaud
Customer Number 
ePlanReviewYes
Description
WUI Zone A; Permit for the construction of a new 3399 sq. ft., two story (first story 816 sq. ft., second story 1296 sq. ft., third story 1287 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 320 sq. ft. of balcony, 70 sq. ft. covered porch, 210 sq. ft. sunroom, 210 sq. ft. covered car port and a 545 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. R-1C zoning and setbacks per planning.//leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/9/201612/9/201612/9/2016PPASS
DetailsJim Sly
jared Phone #: ###-####
DOC - Permit Finaled12/9/201612/9/201612/9/2016PPASS
DetailsJim Sly
BLD-Final12/6/201612/7/201612/7/2016PNR
DetailsJim Sly
Jared Phone #: ###-####
Still need Fire final inspection........
BLD-Final12/5/201612/6/201612/6/2016PNR
DetailsJim Sly
jared Phone #: ###-####
Need Fire final OK and complete previous correction notice. Called Jared....left V/mssg.
PubWorks Occupancy Approval12/6/201612/6/201612/6/2016 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final12/2/201612/5/201612/5/2016PNR
DetailsTony Young
jared Phone #: ###-####,, not all done
BLD-Final12/2/201612/5/201612/5/2016ANR
DetailsTony Young
jared Phone #: ###-####
BLD-Final12/1/201612/2/201612/2/2016PNR
DetailsTony Young
jared Phone #: ###-####,, conf walk through only,, correction notice posted,, need trades,, blower door test,, fire cailking,, temp glass,, stairs per code,, roof completed,, etc.
BLD-Energy code compliance9/27/20169/29/20169/29/2016PPASS
DetailsJim Sly
Jared Phone #: ###-####
BLD-Energy code compliance9/20/20169/21/20169/21/2016ANR
DetailsJim Sly
Jared Phone #: ###-####
Talked to Jared. Notified at frame insp. that Sprinklers not inspected yet. Still no inspection at Energy Code inspection. No approval for cover.
BLD-Framing/Rough-in9/14/20169/15/20169/15/2016PPASS
DetailsJim Sly
Jared Phone #: ###-####
BLD-Framing/Rough-in9/9/20169/12/20169/12/2016PNR
DetailsJim Storey
would like call ahead; Jared Phone #: ###-#### beam to floor joist/ gyp cans/ nuts portal
Plan Modification Accepted  8/31/2016 DONE
new manual j
Routing - MECHANICAL8/31/2016 8/31/2016 PASS
DetailsTroy James
resubmitted acca report
BLD-Wall Bracing8/24/20168/25/20168/25/2016APASS
DetailsTony Young
Phone #: 4404356 >> Inspection requested via mobile web by Eric,, exterior shear ok
BLD-Wall Bracing8/22/20168/23/20168/23/2016AFAIL
DetailsTony Young
Phone #: 4404356 >> Inspection requested via mobile web by Eric Atwood,, need to finish per plan,, recall
BLD-Foundation6/24/20166/24/20166/24/2016APASS
DetailsPhil Shearer
Phone #: 2089616103 >> Inspection requested via mobile web by Alva Ponce
BLD-Footing6/23/20166/23/20166/23/2016PPASS
DetailsPhil Shearer
Alvaro-says soil report was emailed to Tony Y Phone #: ###-####
PubWorks Subgrade Approval6/23/20166/23/20166/23/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing6/22/20166/22/20166/22/2016PPEND
DetailsTony Young
Advardo Phone #: ###-####,, ok pending soils report approval,, ok to pour after
Issue PAID IN FULL permit  6/9/2016 DONE
Inspection Record Card- Bld  6/9/2016 DONE
OVERRIDE  6/7/2016  
Plan assigned to (LEG) Tisha5/19/2016 6/7/2016 DONE
DetailsTisha Gallop
1st review 6/6 L2 hillside (sprinkled)
Plan resubmittals received  6/7/2016 DONE
Routing - PLAN CHECK6/7/2016 6/7/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  6/7/2016 DONE
Permit Ready to Issue  6/7/2016 DONE
DetailsChristina Prado
All requirements met
Routing - PLAN CHECK5/19/2016 6/6/2016 FAIL
DetailsTisha Gallop
see changemarks
Case Summary (BLD)  6/6/2016 DONE
1st review completed  6/6/2016 FAIL
Routing - FIRE5/26/20165/26/20165/26/2016 PASS
DetailsScott Arellano
Approved; with the condition that this structure is protected with a fire sprinkler system designed and installed in accordance with NFPA 13D. A seperate permit will be required for the fire sprinkler system.
Routing PW Grading-Hillside5/19/2016 5/25/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Telephone call  5/25/2016 DONE
DetailsScott Arellano
Spoke with Nick Drzayich and the owner has agreed to exercise the option of fire sprinklering the structure in lieu of adding a new fire hydrant.
Routing - FIRE5/19/20165/19/20165/20/2016 FAIL
DetailsScott Arellano
Emailed applicant plan review report. Attached report to permit case.
Routing - PUBLIC WORKS5/19/2016 5/20/2016 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment5/19/2016 5/20/2016 PASS
DetailsAndy J. Long
ESC site map and narrative approved. Valid Plan Designer and Responsible person designated. Site preparation inspection REQUIRED
Plans ACCEPTED BY PLAN TECH  5/19/2016 DONE
DetailsChristina Prado
Intake Approval  5/19/2016 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/19/2016 DONE
DetailsChristina Prado
Routing - MECHANICAL5/19/2016 5/19/2016 PASS
DetailsTroy James
Routing - PLANNING5/19/2016 5/19/2016 PASS
DetailsLeon Letson
Routing - Addressing5/19/2016 5/19/2016 PASS
DetailsLaura Hunter
Application received  3/28/2016 DONE
Application submitted via PDS Online on Mar 28 2016 10:01PM