BLD-Final | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | PASS |
Jim Sly
|
|
|
jared Phone #: ###-####
|
DOC - Permit Finaled | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/6/2016 | 12/7/2016 | 12/7/2016 | P | NR |
Jim Sly
|
|
|
Jared Phone #: ###-#### Still need Fire final inspection........
|
BLD-Final | 12/5/2016 | 12/6/2016 | 12/6/2016 | P | NR |
Jim Sly
|
|
|
jared Phone #: ###-#### Need Fire final OK and complete previous correction notice. Called Jared....left V/mssg.
|
PubWorks Occupancy Approval | 12/6/2016 | 12/6/2016 | 12/6/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 12/2/2016 | 12/5/2016 | 12/5/2016 | P | NR |
Tony Young
|
|
|
jared Phone #: ###-####,, not all done
|
BLD-Final | 12/2/2016 | 12/5/2016 | 12/5/2016 | A | NR |
Tony Young
|
|
|
jared Phone #: ###-####
|
BLD-Final | 12/1/2016 | 12/2/2016 | 12/2/2016 | P | NR |
Tony Young
|
|
|
jared Phone #: ###-####,, conf walk through only,, correction notice posted,, need trades,, blower door test,, fire cailking,, temp glass,, stairs per code,, roof completed,, etc.
|
BLD-Energy code compliance | 9/27/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Jim Sly
|
|
|
Jared Phone #: ###-####
|
BLD-Energy code compliance | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | NR |
Jim Sly
|
|
|
Jared Phone #: ###-#### Talked to Jared. Notified at frame insp. that Sprinklers not inspected yet. Still no inspection at Energy Code inspection. No approval for cover.
|
BLD-Framing/Rough-in | 9/14/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Jim Sly
|
|
|
Jared Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2016 | 9/12/2016 | 9/12/2016 | P | NR |
Jim Storey
|
|
|
would like call ahead; Jared Phone #: ###-#### beam to floor joist/ gyp cans/ nuts portal
|
Plan Modification Accepted | | | 8/31/2016 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 8/31/2016 | | 8/31/2016 | | PASS |
Troy James
|
|
|
resubmitted acca report
|
BLD-Wall Bracing | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PASS |
Tony Young
|
|
|
Phone #: 4404356 >> Inspection requested via mobile web by Eric,, exterior shear ok
|
BLD-Wall Bracing | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | FAIL |
Tony Young
|
|
|
Phone #: 4404356 >> Inspection requested via mobile web by Eric Atwood,, need to finish per plan,, recall
|
BLD-Foundation | 6/24/2016 | 6/24/2016 | 6/24/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2089616103 >> Inspection requested via mobile web by Alva Ponce
|
BLD-Footing | 6/23/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Phil Shearer
|
|
|
Alvaro-says soil report was emailed to Tony Y Phone #: ###-####
|
PubWorks Subgrade Approval | 6/23/2016 | 6/23/2016 | 6/23/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 6/22/2016 | 6/22/2016 | 6/22/2016 | P | PEND |
Tony Young
|
|
|
Advardo Phone #: ###-####,, ok pending soils report approval,, ok to pour after
|
Issue PAID IN FULL permit | | | 6/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/7/2016 | | |
|
|
|
|
Plan assigned to (LEG) Tisha | 5/19/2016 | | 6/7/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 6/6 L2 hillside (sprinkled)
|
Plan resubmittals received | | | 6/7/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/7/2016 | | 6/7/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/7/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PLAN CHECK | 5/19/2016 | | 6/6/2016 | | FAIL |
Tisha Gallop
|
|
|
see changemarks
|
Case Summary (BLD) | | | 6/6/2016 | | DONE |
|
|
|
|
1st review completed | | | 6/6/2016 | | FAIL |
|
|
|
|
Routing - FIRE | 5/26/2016 | 5/26/2016 | 5/26/2016 | | PASS |
Scott Arellano
|
|
|
Approved; with the condition that this structure is protected with a fire sprinkler system designed and installed in accordance with NFPA 13D. A seperate permit will be required for the fire sprinkler system.
|
Routing PW Grading-Hillside | 5/19/2016 | | 5/25/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Telephone call | | | 5/25/2016 | | DONE |
Scott Arellano
|
|
|
Spoke with Nick Drzayich and the owner has agreed to exercise the option of fire sprinklering the structure in lieu of adding a new fire hydrant.
|
Routing - FIRE | 5/19/2016 | 5/19/2016 | 5/20/2016 | | FAIL |
Scott Arellano
|
|
|
Emailed applicant plan review report. Attached report to permit case.
|
Routing - PUBLIC WORKS | 5/19/2016 | | 5/20/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 5/19/2016 | | 5/20/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid Plan Designer and Responsible person designated. Site preparation inspection REQUIRED
|
Plans ACCEPTED BY PLAN TECH | | | 5/19/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/19/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/19/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 5/19/2016 | | 5/19/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/19/2016 | | 5/19/2016 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 5/19/2016 | | 5/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Application received | | | 3/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2016 10:01PM
|