BLD-Final | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Josh Phone #: ###-####
|
DOC - Permit Finaled | 6/23/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | FAIL |
Phil Shearer
|
|
|
call ahead for access; Josh Phone #: ###-####. Need steps and landing at slideing door.
|
BLD-Framing/Rough-in | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | PASS |
Jim Storey
|
|
|
Josh Phone #: ###-#### exterior ok to cover
|
BLD-Footing | 4/5/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Jim Storey
|
|
|
Josh Phone #: ###-####
|
OVERRIDE | | | 4/4/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/4/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 3/30/2016 | 3/30/2016 | 4/1/2016 | A | DONE |
Brittany Hill
|
|
|
|
1st review completed | | | 4/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/1/2016 | | 4/1/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/1/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Plan assigned to (JG) | 3/30/2016 | 3/30/2016 | 3/31/2016 | | DEFR |
Javier Guzman
|
|
|
20 x 20 residential addition
|
Routing Walk-In (Zoning) | 3/30/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Josh Wilson
|
|
|
Ok per R-1C setbacks.
|
Application received | | 3/30/2016 | | | |
|
|
|
|