Meeting | | | 5/11/2018 | | DONE |
|
|
|
sent statement 5-14
|
Print Statement | | | 5/11/2018 | | DONE |
|
|
|
|
Print Statement | | | 3/20/2018 | | DONE |
|
|
|
|
Third Notice | | 2/17/2018 | 3/14/2018 | | DONE |
|
|
|
Mailed 3-15-18
|
Second Notice | | 1/21/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
First Notice | | 12/17/2017 | 1/11/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
PubWorks Occupancy Approval | 12/7/2017 | 12/7/2017 | 12/7/2017 | | DONE |
Mike Sheppard
|
|
|
|
Permanent Occupancy | | | 12/7/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/7/2017 | | DONE |
|
|
|
|
Telephone call | | | 12/6/2017 | | DONE |
|
|
|
called Karen to let know temp c of o will expire Monday 12/11/17
|
BLD-Final | 11/17/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Jim Sly
|
|
|
OK for Perm Occ. when all Requirements for Perm Occ. are met.
|
BLD-Aging Inspection | 11/10/2017 | 11/10/2017 | 11/17/2017 | | CANC |
Jim Sly
|
|
|
|
Temporary Occupancy | 9/12/2017 | 12/11/2017 | 9/12/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd extension request from 8/31/17
|
Telephone call | | | 9/8/2017 | | DONE |
|
|
|
called again about the temp c of o that is expired-left message pm Karen's mail-called Ron Hill as well and left message
|
BLD-Aging Inspection | 8/21/2017 | 8/21/2017 | 8/28/2017 | | CANC |
Jim Sly
|
|
|
|
Telephone call | | | 8/22/2017 | | DONE |
|
|
|
called ESI to let know temp c of o expires next week on 8-31-17-left message on main office machine
|
BLD-Final | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | PART |
Jim Sly
|
|
|
OK for Temp Occ. OK for Perm Occ. when all required trades and agencies on signature card signs for Perm. Occ.
|
Temporary Occupancy | 6/2/2017 | 8/31/2017 | 6/2/2017 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Final Inspection | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 6/1/2017 | 6/1/2017 | 6/1/2017 | | DONE |
David Moser
|
|
|
|
BLD-Final | 5/30/2017 | 5/31/2017 | 5/31/2017 | P | NR |
Jim Sly
|
|
|
Roger Phone #: ###-#### Need all required finals.
|
BLD-Ceiling Grid Inspection | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Jim Sly
|
|
|
fire caulking; Roger Phone #: ###-####
|
BLD-Other | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Jim Sly
|
|
|
fire caulking; Roger Phone #: ###-####
|
BLD-Other | 2/7/2017 | 2/8/2017 | 2/8/2017 | A | PASS |
Mike Jordan
|
|
|
Dave//Fire caulking Phone #: ###-####. firecaulking at 2nd floor mech. shaft ok to rcock.
|
BLD-Conference | 12/30/2016 | 1/3/2017 | 1/3/2017 | A | PASS |
Jim Sly
|
|
|
Part of the first and second floor // Dave Phone #: ###-#### All Framing Approved.....Pending all trade rough ins approved.
|
BLD-Framing/Rough-in | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### Dorm Rooms OK.
|
BLD-Framing/Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Front....Exterior wall framing...OK.
|
BLD-Wall Bracing | 11/4/2016 | 11/7/2016 | 11/8/2016 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### No bracing to look at yet, but OK to cover East, South and West exterior wall on the outside.
|
BLD-Other | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Jim Sly
|
|
|
rebar/slab - Dave Phone #: ###-#### OK pending STRATA special insp, tests and approvals.
|
BLD-Foundation | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | PASS |
Jim Sly
|
|
|
Dave-re-enforcing-grouting CMU Block Phone #: ###-####
|
BLD-Other | 8/25/2016 | 8/26/2016 | 8/26/2016 | P | DONE |
Jim Sly
|
|
|
Dave-reinforcing grout-times 2:00 Phone #: ###-#### STRATA on site.
|
BLD-Other | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PART |
Jim Sly
|
|
|
Dave-reinforcing grout-times 9:30 Phone #: ###-#### Select CMU reinforcement/grout OK pending STRATA special inspections, tests and approvals.
|
BLD-Foundation | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### Select walls....OK pending STRATA special inspections, tests and approvals.
|
BLD-Foundation | 8/18/2016 | 8/19/2016 | 8/19/2016 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### STRATA on site.
|
BLD-Concrete | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### CMU grout pour select walls OK pending STRATA special inspections, tests and approvals.
|
BLD-Concrete | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### CMU grout pour......2nd lift, select walls OK pending STRATA special inspections, tests and approvals.
|
BLD-Other | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PART |
Jim Sly
|
|
|
Dave ###-#### grout inspection Phone #: ###-#### 1st pour......OK pending SRATA special inspections,tests and approvals.
|
FIRE-Conference | 7/13/2016 | 7/14/2016 | 7/13/2016 | A | DONE |
Troy Cobbley
|
|
|
Todays inspection was just for the stub out from the building. Top of pipe measured 4'-2" to the top of the footing. Per the job superintendant and the underground installer an additional 12" of dirt is to be installed on top of the pipe. This will give the required 4'-6" of cover.
|
BLD-Footing | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PART |
Jim Sly
|
|
|
Dusty Phone #: ###-#### Select Footings OK pending STRATA special insp, tests and approvals.
|
Fees Due Hold | 6/8/2016 | | 6/21/2016 | | DONE |
Kristal Soland
|
|
|
|
Issue PAID IN FULL permit | | | 6/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/2/2016 | | |
|
|
|
|
Routing - PLAN CHECK | 6/2/2016 | | 6/2/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/2/2016 | | DONE |
|
|
|
need RP, ACHD, GC & rev cert of val
|
Plan assigned to (TLW) | 4/12/2016 | | 6/2/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 6/1/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/11/2016 | | 5/19/2016 | | FAIL |
Tim L. Woodard
|
|
|
Change marks added to drawings. TLW
|
1st review completed | | | 5/19/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 5/17/2016 | | 5/17/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PLUMBING | 5/11/2016 | | 5/16/2016 | | FAIL |
Daryl Spivey
|
|
|
no resubmittals
|
Routing - PLANNING | 5/11/2016 | | 5/13/2016 | | PASS |
David Moser
|
|
|
ROS15-00112 is complete
|
Routing - FIRE | 5/11/2016 | 5/11/2016 | 5/12/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Drainage | 5/11/2016 | | 5/12/2016 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 5/11/2016 | | DONE |
|
|
|
|
Routing PW Environmental | 4/12/2016 | | 5/5/2016 | | PASS |
Rick Christenson
|
|
|
decon room with drains
|
Routing - PLAN CHECK | 4/12/2016 | | 5/5/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 5/3/2016 | | 5/3/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING Land Div | 4/12/2016 | | 4/20/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 4/12/2016 | 4/12/2016 | 4/18/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing Off Site - STRUCTURAL | 4/12/2016 | | 4/18/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved without a routing task in e-plan. A letter was uploaded indicating approval by outsource engineer. TLW
|
Routing PW Drainage | 4/12/2016 | | 4/18/2016 | | PASS |
Brian Murphy
|
|
|
needs o and m agreement revision
|
Routing - PLUMBING | 4/12/2016 | | 4/14/2016 | | FAIL |
Daryl Spivey
|
|
|
1) P-1-1 FD-1 in riser room needs to be a 4"
2) P-201 vent all fixtures
|
Routing - PLANNING | 4/12/2016 | | 4/13/2016 | | FAIL |
David Moser
|
|
|
Need to complete ROS15-00112
|
Routing PW Sewer Design | 4/12/2016 | | 4/13/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - MECHANICAL | 4/12/2016 | | 4/13/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 4/12/2016 | | 4/13/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/12/2016 | | 4/13/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
**Project Management-Ron Hill** **GREEN TAG EXPIDITED REVIEW - Review to 2012 IgCC** (CITY OF BOISE - Fire Station #4) Permit to construct a new 13,774 square foot Fire Station. New construction for Fire Station 4
Review to International Green Construction Code Standards. TLW
|
Intake Approval | | | 4/12/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 4/12/2016 | | 4/12/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 4/12/2016 | | 4/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 4/11/2016 | | FAIL |
|
|
|
The required Special Inspections are to be identified on the Structural Plans in addition to Form 310. Please list them on the drawings.
|
Plan Reviewer's activity | | | 4/11/2016 | | PASS |
|
|
|
Plan intake approved
|
Intake Approval | | | 4/5/2016 | | FAIL |
Carl Westfall
|
|
|
Please refer to the circled items in the plan intake checklist and provide the requested items.
|
Application received | | | 3/31/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 31 2016 7:53AM
|