Print Statement | | | 2/6/2019 | | DONE |
|
|
|
4th late notice-put on hold
|
Print Statement | | | 2/6/2019 | | DONE |
|
|
|
sent late notice to parcel owner
|
Print Statement | | | 11/23/2018 | | DONE |
|
|
|
sent 3rd late notice
|
Print Statement | | | 10/3/2018 | | DONE |
|
|
|
SENT 2ND LATE NOTICE
|
Print Statement | | | 9/12/2018 | | DONE |
|
|
|
sent 1st late notice
|
Print Statement | | | 6/8/2018 | | DONE |
|
|
|
|
Print Statement | | | 6/5/2018 | | DONE |
|
|
|
|
Second Notice | | 4/20/2018 | 5/11/2018 | | DONE |
|
|
|
mailed 5-14
|
First Notice | 4/2/2018 | 4/2/2018 | 4/10/2018 | | DONE |
Jim Storey
|
|
|
mailed to steve 4-11-18
|
BLD-Final | 3/30/2018 | 4/2/2018 | 4/2/2018 | A | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Jim Storey
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/8/2017 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2017 | | DONE |
|
|
|
Spoke with Steve informing him there are still plan mod fees due and the permit is going to expire in 12 days. Suggested to pay those and if possible to schedule an inspection to extend his permit or close it out. He said he would try to come in today to pay (8-30-17)
|
OVERRIDE | | | 5/30/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 5/30/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
***DO NOT RE-ISSUE PERMIT, CHANGE STATUS TO ISS AFTER PAYMENT***
|
Plan assigned to (JG) | 5/9/2017 | 5/9/2017 | 5/27/2017 | | PASS |
Javier Guzman
|
|
|
Plan Mod Rush Enterprises LLC
|
Routing - PLAN CHECK | 5/25/2017 | | 5/27/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 5/25/2017 | | 5/25/2017 | | PASS |
Katelyn Menuge
|
|
|
Retaining Wall and Trash Enclosure Modifications Okay
|
Plan Modification Accepted | | | 5/9/2017 | | DONE |
|
|
|
plan mod done in e plan
|
BLD-Final | 3/13/2017 | 3/15/2017 | 3/15/2017 | A | FAIL |
Jim Storey
|
|
|
Please call ahead for access - Steve Phone #: ###-#### wall placed w/concrete no insp./ trash encloser work not done/resolve with planreview and zonning
|
FIRE-Final Inspection | 3/13/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Jim Page
|
|
|
Phone number provided was an incorrect number, Steve Phone #: ###-####. No fire sprinklers, no fire alarms,fire extinguishers are in place with current inspection tags, fire department access is adequate. Final life fire safety inspection passed/complete.
|
PubWorks Occupancy Approval | 3/13/2017 | 3/13/2017 | 3/13/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Issue PAID IN FULL permit | | | 6/8/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 5/25/2016 | | |
|
|
|
|
Plan assigned to (JG) | 4/21/2016 | 4/21/2016 | 5/25/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 5/17 Level 3 TI - ePlanReview - Rush Enterprises LLC Site Work, pending Drainage
|
Routing PW Drainage | 5/24/2016 | | 5/25/2016 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/25/2016 | | DONE |
|
|
|
***all requirments met 6-8-16 /CEV
NEED RP, GC form, and Certificate of value
|
Routing - PLAN CHECK | 5/20/2016 | | 5/20/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Solid Waste | 4/21/2016 | | 5/13/2016 | | PASS |
Megan Durrell
|
|
|
Signed off in ePlan review by Megan Durell
|
1st review completed | | | 5/13/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLAN CHECK | 4/21/2016 | | 5/13/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing PW Grading-Hillside | 4/21/2016 | | 5/6/2016 | | FAIL |
Brian Murphy
|
|
|
|
Routing - FIRE | 4/21/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Katie Marron
|
|
|
New electronic gate shall be provided with fail safe open and an Opticom system. See plan sheet SP-1. No additional comments required.
|
Pending Assignment by JCB | 4/21/2016 | | 4/21/2016 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 4/21/2016 | | 4/21/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2016 | | 4/21/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/21/2016 | | 4/21/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to earth disturbance)
(RUSH ENTERPRISES LLC) Site Improvements including exterior stairs, concrete retaining walls, rock retaining walls, asphalt paving, accessible parking, concrete slab work, trash enclosure, sub-grade filtration system for on-site water retention, some new fencing/gate and landscaping.
|
Routing - Design Review | 4/21/2016 | | 4/21/2016 | | PASS |
Josh Wilson
|
|
|
ok per DRH16-00027
|
Intake Approval | | | 4/20/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Madsen and plan review fees paid.
|
Application received | | | 3/31/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 31 2016 8:38AM
|
Routing PW Drainage | 4/21/2016 | | | | FAIL |
Brian Murphy
|
|
|
needs o and m eng wall
|