Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD16-01054
StatusFinaled
Name LONG GREGG A
Site Address 2703 N MOUNTAIN VIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Scope of work is to remove several interior walls to open up the kitchen and living room areas. Also, adding two french door that lead out to the existing covered patio. A window will also be installed in this wall. A mud room/pantry will be created between the kitchen and garage. Also, an existing window and door will be filled in using like materials. Windows shall be a 0.35 u-value or better. The work will be performed per the approved drawings, stamped enginneering and local codes. An electrical, plumbing and HVAC permit will be pulled separately. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20178/8/20178/8/2017APASS
DetailsJim Storey
Kirt Phone #: ###-####
DOC - Permit Finaled8/8/20178/8/20178/8/2017PPASS
DetailsJim Storey
BLD-Final11/16/201612/29/201612/29/2016PNH
DetailsMike Jordan
ex. No one home.
BLD-Final11/16/201612/27/201612/27/2016ADONE
DetailsJim Sly
ex
Extend Permit 90/180 days12/27/201612/27/201612/27/2016APASS
DetailsJim Sly
ex
BLD-Conference11/16/201611/16/201611/16/2016ANH
DetailsJim Sly
waiting for contr. to call for final insp.
BLD-Aging Inspection11/10/201611/10/201611/16/2016 CANC
DetailsJim Sly
BLD-Aging Inspection11/9/201611/9/201611/16/2016 CANC
DetailsJim Sly
BLD-Framing/Rough-in6/27/20166/28/20166/28/2016APASS
DetailsJim Sly
Phone #: ###-####
Frame and Energy pass.
Routing Walk-In (BLD)3/31/20163/31/20163/31/2016PPASS
DetailsDavid Ferguson
Plan assigned to (DAF)3/31/20163/31/20163/31/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK3/31/2016 3/31/2016 PASS
DetailsDavid Ferguson
Inspection Record Card- Bld  3/31/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  3/31/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  3/31/2016 DONE
Permit Ready to Issue  3/31/2016 DONE
Issue PAID IN FULL permit  3/31/2016 DONE
1st review completed  3/31/2016 DONE
DetailsDavid Ferguson
Application received 3/31/2016