Permanent Occupancy | | | 7/6/2018 | | DONE |
|
|
|
|
Zoning Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 6/6/2018 | 6/6/2018 | 6/7/2018 | P | PASS |
Jim Sly
|
|
|
for perm occ pass on structural OK for Perm. Occ.
|
Temporary Occupancy | 6/6/2018 | 9/4/2018 | 6/6/2018 | | DONE |
Tisha Gallop
|
|
|
Permanent occupancy pending approval from Zoning and full passing inspection by Structural.
|
FIRE-Final Inspection | 5/23/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Jim Page
|
|
|
Remaining items have been addressed, final life fire safety inspection complete.
Reinspection for Final sign off from TCO Phone #: ###-#### Inspection requested via web by shaun carley
|
BLD-Final | 4/30/2018 | 5/1/2018 | 5/2/2018 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by shaun carley OK for Temp Occ. OK for Perm Occ. when Fire and Zoning signs off for Perm.
|
FIRE-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | PART |
Jim Page
|
|
|
Partial life fire safety inspection for tco complete (30 day TCO per conversation with Ron Johnson) Fire sprinkler inspection complete, fire alarm inspection complete, fire exitnguishers are in place and will get inspection tags installed before final inspection. Items that need to be completed before final is a knox box installed by front entry and emergency evacuation plan for each unit, items will be verified before final C of O
|
BLD-Final | 4/27/2018 | 4/30/2018 | 4/30/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by shaun carley Inspection cancelled from web by: shaun carley
|
Zoning Approval Temp | 4/25/2018 | 4/25/2018 | 4/25/2018 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Ceiling Grid Inspection | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Jim Sly
|
|
|
above ceiling grid inspection on the 2nd and 3rd floor corridors. Phone #: ###-#### Inspection requested via web by shaun carley
|
BLD-Ceiling Grid Inspection | 3/5/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Jim Sly
|
|
|
Above grid inspection in corridors on the 5th and 4th floors. Shaft liner inspection for trash chute in elevator lobbies. Phone #: ###-#### Inspection requested via web by shaun carley
|
BLD-Ceiling Grid Inspection | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PASS |
Jim Sly
|
|
|
Fire caulk inspection in the drops in units 309-319 Phone #: ###-#### Inspection requested via web by shaun carley
|
BLD-Ceiling Grid Inspection | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | PASS |
Jim Sly
|
|
|
Inspect above grid in units 209,210,211,212,213,214,215,216,217,218, and 219. Phone #: ###-#### Inspection requested via web by shaun carley
|
BLD-Other | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Jim Sly
|
|
|
Fire caulk inspection in drops units 409-419 and corridor building 1. Phone #: ###-#### Inspection requested via web by shaun carley
|
BLD-Other | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | CANC |
Brandon Shaw
|
|
|
fire caulk in drops for units 409-419 and 4th floor corridor // Shaun ###-####
|
BLD-Framing/Rough-in | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Jim Sly
|
|
|
drops units 509-519 Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Jim Sly
|
|
|
Units 201-208 framed drops Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Jim Sly
|
|
|
Units 409-419 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Jim Sly
|
|
|
Drop Ceilings units 301-308 Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 10/31/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Jim Sly
|
|
|
North and South Stair Towers and Level 4 drop ceiling areas units 401-408 Phone #: ###-#### Inspection requested via web by Michael West
|
FIRE-Conference | 10/26/2017 | 10/27/2017 | 10/27/2017 | P | DONE |
Troy Cobbley
|
|
|
Tenting of sprinkler lines in units 509-519 passed. Numerous corrections made while I was on site. I also made an entry in the project related fire sprinkler permit activites.
|
BLD-Framing/Rough-in | 10/20/2017 | 10/20/2017 | 10/20/2017 | A | PASS |
Jim Sly
|
|
|
Units 501-508 fur down ceilings Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 10/13/2017 | 10/16/2017 | 10/17/2017 | P | PASS |
Jim Sly
|
|
|
Units 209-219 Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Jim Sly
|
|
|
Units 509-519 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Energy code compliance | 10/5/2017 | 10/9/2017 | 10/9/2017 | A | NR |
Jim Sly
|
|
|
units 209-219 // Matt Fletcher Phone #: ###-####
|
BLD-Framing/Rough-in | 10/5/2017 | 10/9/2017 | 10/9/2017 | A | NR |
Jim Sly
|
|
|
units 209-219 // Matt Fletcher Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 | A | PASS |
Jim Sly
|
|
|
Level 2 Corridor Ceiling to pre-rock Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 9/8/2017 | 9/8/2017 | 9/11/2017 | P | PASS |
Jim Sly
|
|
|
Units 201-208 ready to insulate Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 8/29/2017 | 8/30/2017 | 8/30/2017 | A | PASS |
Jim Sly
|
|
|
Units 301-308 Ready for insulation. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | PASS |
Jim Sly
|
|
|
Units 401-408 Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Jim Sly
|
|
|
Units 501-508 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PART |
Jim Sly
|
|
|
Elevator shaft Phone #: ###-#### Inspection requested via web by Michael West Elevator shaft OK to cover.
|
BLD-Conference | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Jim Sly
|
|
|
Mike West Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/19/2017 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 6/19/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/12/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 5/24/2017 | 5/24/2017 | 6/12/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/8/2017 | | 6/12/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
shaft in clubhouse plan modification
|
Permit Ready to Issue | | | 6/12/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod requirements met
DO NOT RE-ISSUE
|
Routing - MECHANICAL | 6/8/2017 | | 6/9/2017 | | PASS |
Troy James
|
|
|
Uploaded new A363 detail sheet for mechanical shaft.
|
Routing - PLAN CHECK | 5/31/2017 | | 6/7/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 5/31/2017 | | 6/1/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH16-00498-Window Trim Modification Okay
|
Routing - MECHANICAL | 5/31/2017 | | 6/1/2017 | | PASS |
Troy James
|
|
|
1 hour review time
|
Routing - PLAN CHECK | 5/31/2017 | | 5/31/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
returned mod submitta, need a sheets named the same to version.
|
Plan Modification Accepted | | | 5/24/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to remove mechanical dampers from clubhouse and modify the trim around misc. windows
|
CHANGE STATUS TO (ISS) | | | 3/16/2017 | | DONE |
|
|
|
plan mod fees paid
|
OVERRIDE | | | 12/21/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 12/9/2016 | 12/9/2016 | 12/21/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/13/2016 | | 12/21/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Exterior finish chage from fiber to stucco only
|
Permit Ready to Issue | | | 12/21/2016 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan mod
DO NOT RE-ISSUE, MUST PAY ALL FEES DUE PRIOR TO CHANGING STATUS TO ISS
|
Routing - Design Review | 12/13/2016 | | 12/14/2016 | | PASS |
Josh Wilson
|
|
|
Ok per DRH16-00498
|
Plan Modification Accepted | | | 12/9/2016 | | DONE |
Christina Prado
|
|
|
Exterior Material finsh changes
|
BLD-Concrete | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Phil Shearer
|
|
|
walls and footings Phone #: ###-#### Inspection requested via web by Michael West
|
Place hold on job | 8/11/2016 | | 8/16/2016 | | DONE |
Kristal Soland
|
|
|
DO NOT ISSUE WITHOUT BLD16-01058 TO BLD16-01060
|
Issue PAID IN FULL permit | | | 8/16/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/16/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/19/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 7/19/2016 | | DONE |
Christina Prado
|
|
|
***ALL MET 8-11-16*** Need RP,
**MET 8-10** ACHD,GC Form & Revised Certificate of Value for issuance
DO NOT ISSUE WITHOUT ALL 3 PERMITS - BLD16-01058, 01059 & 01060
|
Routing - PLAN CHECK | 7/18/2016 | | 7/18/2016 | | PASS |
Tim L. Woodard
|
|
|
All items adequatly addressed. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/8/2016 | | 7/18/2016 | | PASS |
Tim L. Woodard
|
|
|
2nd review completed.
|
Plan resubmittals received | | | 7/15/2016 | | DONE |
|
|
|
Resubmittals recieved. TLW
|
Routing Off Site - STRUCTURAL | 5/31/2016 | | 7/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/31/2016 | | 7/5/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 5/31/2016 | | 6/3/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 5/31/2016 | | DONE |
|
|
|
|
Routing - PLUMBING | 5/31/2016 | | 5/31/2016 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Route to Impact Fee Review | 5/12/2016 | 5/15/2016 | 5/13/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 5/12/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/8/2016 | | 5/12/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLANNING Land Div | 4/8/2016 | | 5/12/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan. TLW
|
Routing Off Site - STRUCTURAL | 4/8/2016 | | 5/12/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 4/11/2016 | | 5/12/2016 | | PASS |
Tom Marshall
|
|
|
Approved in E-Plan. TLW
|
Routing PW Flood Plain | 4/11/2016 | | 4/21/2016 | | PASS |
Jim Wyllie
|
|
|
|
Routing - Design Review | 4/8/2016 | | 4/20/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 4/8/2016 | | 4/18/2016 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 4/8/2016 | 4/8/2016 | 4/12/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Solid Waste | 4/11/2016 | | 4/11/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Grading-Hillside | 4/11/2016 | | 4/11/2016 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PLUMBING | 4/8/2016 | | 4/11/2016 | | FAIL |
Daryl Spivey
|
|
|
1) provide suds relief ( change mark )
2) provide P1.13
3) air admittance valves are only approved for island sinks
4) provide standard trap primers ( change mark )
|
Routing PW Sewer Design | 4/11/2016 | | 4/11/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
No review required, private sewer system.
|
Routing PW Drainage | 4/11/2016 | | 4/11/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 4/8/2016 | | 4/11/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/8/2016 | | 4/11/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to earth disturbance)
BUILDING #1: Arboretum at Barber Station is a 162 unit apartment complex consisting of 3 building on a 4.07 acre site. Buildings 1 & 2 are podium structures with 4 stories of apartments in Type 5A wood construction over 1 story of Type 1A post-tension concrete structure. Building 3 is a two story Type 5B wood construction with 1 level of apartment units over tenant amenities.
A separate structural podium permit application has been filed for Buildings 1 and 2.
|
Routing - Addressing | 4/8/2016 | | 4/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 4/8/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 4/8/2016 | | 4/8/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 3/31/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 31 2016 4:48PM
|
First Notice | | 7/16/2018 | | | |
|
|
|
|
CHANGE ISSUED DATE | | | | | |
|
|
|
|